GST-MNA2C/GST-MNA2F Network Annunciator
Installation and Operation Manual
Page 6
Fig.3-2
3.3 Start-up Check
After installation, apply power to the annunciator and check if the annunciator can
self-test. The procedures are as follows.
Powering on the annunciator
, LCD doesn’t light and all LEDs are illuminated for 5s.
As All LED go out, LCD displays
Data Loading……
and GST logo. Initiation of the
system takes about 85s~90s.
Self-test of LEDs on the front panel.
Self-test of internal cards.
Reset of the system.
Start-up check is done if the annunciator switches on normally after undertaking above
steps.
Note: After power on, the annunciator will display some fault messages because the
external wiring is not connected.
Содержание GST-MNA2C
Страница 1: ......
Страница 8: ...GST MNA2C GST MNA2F Network Annunciator Installation and Operation Manual Page 5 Fig 3 1...