Rest Platform
31
PNEG-1295
16" - 36" Platforms
Side Mounting Channels
The first step to assemble the rest platform
is to attach the side mounting channels to
the tie angles. For 16" & 24" special, tie
angles are in rest platform packages,
(GECT 1640-RSP) and must be mounted in
place of standard tie angles.
1. 1/2"-13 x 1" Hex Bolt
2. 1/2"-13 Hex Nut
3. Left & Right Side Mounting Channel:
16", 24", 30", & 36" Bucket Elevator
(RSP16005, RSP16006)
Figure 22
Содержание PNEG-1295
Страница 1: ...16 36 Platform Installation Manual PNEG 1295 PNEG 1295 Revision Date 10 16 2006...
Страница 2: ......
Страница 30: ...Rest Platform 30 PNEG 1295 16 36 Platforms REST PLATFORM ASSEMBLY...
Страница 39: ...Rest Platform 39 PNEG 1295 16 36 Platforms 14 Ladder Assembly at Rest Platform Figure 31...