ELECTRICAL POWER SUPPLY
Autoflow to Actuator Interconnect
The Actuator Control Box houses the 24V DC
linear actuator, two (2) 12V DC Batteries, and a
24V DC battery charger. The linear actuator raises
and lowers the dump chutes to unload grain
automatically from the drying chamber to the storage
chamber. The two (2) 12V DC batteries act as a
backup to prevent wet grain from dumping into the
storage chamber during a power outage. The 24V
DC battery charger provides a continuous recharge
to the batteries.
To wire the Actuator Control Box to the Autoflow
Control Box do the following.
1)
Run five (5) control wires from the
Autoflow Control Box to the Actuator
Control Box.
2)
Run three (3) power wires from the
Entrance Panel to the Actuator Control
Box.
3)
Connect the wires as shown in figure
20.
Figure 20
Содержание Autoflow 2000 Series
Страница 9: ...2000 Autoflow 9 Component Placement INSTALLATION...
Страница 17: ...2000 Autoflow 17 INSTALLATION Close Up Detail of Grain Temperture Sensor Wiring...
Страница 19: ...2000 Autoflow 19 Plenum hi limit installation INSTALLATION...
Страница 22: ...2000 Autoflow 22 INSTALLATION Figure 6...
Страница 24: ...2000 Autoflow 24 INSTALLATION Figure 7...
Страница 27: ...2000 Autoflow 27 INSTALLATION Figure 9...
Страница 29: ...2000 Autoflow 29 INSTALLATION Figure 10 3 00 ROOF MOUNT PLATE COMPRESSION COUPLER...
Страница 31: ...2000 Autoflow 31 INSTALLATION Figure 11...
Страница 39: ...2000 Autoflow 39 ELECTRICAL POWER SUPPLY Figure 18...
Страница 45: ...2000 Autoflow 45 Figure 23 ELECTRIAL POWER SUPPLY...
Страница 47: ...2000 Autoflow 47 ELECTRICAL POWER SUPPLY Autoflow to Ground Interconnect Figure 25...
Страница 52: ...2000 Autoflow 52 ELECTRICAL POWER SUPPLY Figure 29...
Страница 54: ...2000 Autoflow 54...