
2000 Autoflow
3
Roof Warning, Operation & Safety................................................................................4
SafetyAlertDecals.......................................................................................................5
SafetyPrecautions........................................................................................................6
SafetySign-off Sheet...................................................................................................7
an/HeaterandControlBoxMounting..............................................................................8
AutoflowControlBoxBolt Pattern.................................................................................10
Fill System Control Box Mounting.............................................................................11
FillSystem Control Bolt Pattern..................................................................................12
Actuator Control Box Mounting.................................................................................13
Multi-GrainTemperatureSensorWiring.........................................................................15
Grain Temperature Sensor Mounted to Leveling Band Post........................................16
Close-up of Grain Temperature Sensor Wiring.............................................................17
PlenumTemperatureSensorInstallation..........................................................................18
Airswitch Installation.................................................................................................19
WetSupplyRotary Switch..........................................................................................21
Storage Chamber High Limit Rotary Switch Installation...........................................22
Drying Chamber Rotary Switches...............................................................................25
Drying Chamber Low-Level Rotary Switch Installation............................................26
Drying Chamber High-Level Rotary Switch Installation...........................................28
Drying Chamber Overflow Switch Installation.............................................................30
LPFuelSpecificationsandRecommendations................................................................32
NGFuelSpecificationsandRecommendations...............................................................33
cuit Runs................................................................................................................34
ElectricalPowerSupply...................................................................................................35
Ground Rod.....................................................................................................36
MotorWiring........................................................................................................37
MainPowerSchematic.................................................................................................37
ElectricalLoadInformation.............................................................................................38
Wire Size Information................................................................................................39
Fill System Control Box Electrical Load Information.................................................40
Autoflowto Master Fan/Heater Unit Interconnect...........................................................42
Autoflow to Actuator Interconnect.............................................................................43
Autoflow to Wet Supply Rotary Switch Interconnect.................................................44
Autoflow to Storage Chamber Rotary Switch Interconnect.......................................45
Autoflow to Drying Chamber Rotary Switches Interconnect..........................................46
Autoflow to Fill System Control Box Interconnect....................................................48
Autoflow to Ground Interconnect............................................................................ 49
Master to Slave Interconnect......................................................................................50
Slaveto Slave Interconnect.........................................................................................51
BatteryHookUp.........................................................................................................52
Dump Chute Cable Installation...................................................................................53
Wrranty.......................................................................................................................55
TABLE OF CONTENTS
Содержание Autoflow 2000 Series
Страница 9: ...2000 Autoflow 9 Component Placement INSTALLATION...
Страница 17: ...2000 Autoflow 17 INSTALLATION Close Up Detail of Grain Temperture Sensor Wiring...
Страница 19: ...2000 Autoflow 19 Plenum hi limit installation INSTALLATION...
Страница 22: ...2000 Autoflow 22 INSTALLATION Figure 6...
Страница 24: ...2000 Autoflow 24 INSTALLATION Figure 7...
Страница 27: ...2000 Autoflow 27 INSTALLATION Figure 9...
Страница 29: ...2000 Autoflow 29 INSTALLATION Figure 10 3 00 ROOF MOUNT PLATE COMPRESSION COUPLER...
Страница 31: ...2000 Autoflow 31 INSTALLATION Figure 11...
Страница 39: ...2000 Autoflow 39 ELECTRICAL POWER SUPPLY Figure 18...
Страница 45: ...2000 Autoflow 45 Figure 23 ELECTRIAL POWER SUPPLY...
Страница 47: ...2000 Autoflow 47 ELECTRICAL POWER SUPPLY Autoflow to Ground Interconnect Figure 25...
Страница 52: ...2000 Autoflow 52 ELECTRICAL POWER SUPPLY Figure 29...
Страница 54: ...2000 Autoflow 54...