INSTALLATION
TOP DRY PLENUM HI LIMIT INSTALLATION
1. Assemble two pieces of conduit together with coupler.
2. Mount conduit clamps to conduit assembly.
3. Locate conduit assembly on the bottom of a rafter at least 2 feet to one side of the fan entrance. Do not install
between two fan entrances.
4. Mark bin wall where conduit will pass through and drill a hole just large enough to allow the conduit to pass
through. Seal this with caulking when complete.
5. Install white PVC box assembly on outside of bin wall.
6. Insert 10’ capillary into conduit assembly.
7. Connect SJO cord to hi limit and connect wires to terminals 20 and 21 on the master fan terminal strip. These
terminals are J7-08, and J7-03.
Содержание Autoflow 2000 Series
Страница 9: ...2000 Autoflow 9 Component Placement INSTALLATION...
Страница 17: ...2000 Autoflow 17 INSTALLATION Close Up Detail of Grain Temperture Sensor Wiring...
Страница 19: ...2000 Autoflow 19 Plenum hi limit installation INSTALLATION...
Страница 22: ...2000 Autoflow 22 INSTALLATION Figure 6...
Страница 24: ...2000 Autoflow 24 INSTALLATION Figure 7...
Страница 27: ...2000 Autoflow 27 INSTALLATION Figure 9...
Страница 29: ...2000 Autoflow 29 INSTALLATION Figure 10 3 00 ROOF MOUNT PLATE COMPRESSION COUPLER...
Страница 31: ...2000 Autoflow 31 INSTALLATION Figure 11...
Страница 39: ...2000 Autoflow 39 ELECTRICAL POWER SUPPLY Figure 18...
Страница 45: ...2000 Autoflow 45 Figure 23 ELECTRIAL POWER SUPPLY...
Страница 47: ...2000 Autoflow 47 ELECTRICAL POWER SUPPLY Autoflow to Ground Interconnect Figure 25...
Страница 52: ...2000 Autoflow 52 ELECTRICAL POWER SUPPLY Figure 29...
Страница 54: ...2000 Autoflow 54...