
Chapter 3: Assembling the Tower
5. Install the diagonal bracing clips (10 and 11) to the main tower left and right legs (15 and 16) using
7/16" x 1-1/4" HHCS bolts (1), 7/16" flat washers (5) and 7/16" flange nuts (6).
NOTE:
Install nuts (6) to the inside of the leg (15 or 16) flanges.
Figure 3-6
Installing the diagonal bracing clips to the main tower legs (Detail views are shown from bottom)
1
7/16" x 1-1/4" HHCS bolt (S-3886)
11
Diagonal bracing bottom clip
5
7/16" flat washer (S-7548)
15
Main tower left leg
6
7/16" flange nut (S-9073)
16
Main tower right leg
10
Diagonal bracing top clip
16
PNEG-2328
Grain Bin Eave Towers (30' - 48' Bins)