
Chapter 3: Assembling the Tower
3. Assemble the horizontal bracing clips (12) to the main tower right leg (16) using 7/16" x 1-1/4"
HHCS bolts (1), 7/16" flat washers (5) and 7/16" flange nuts (6).
NOTE:
Install nuts (6) to the inside of the leg (16) flanges.
Figure 3-4
Assembling the horizontal bracing clips to the main tower right leg
1
7/16" x 1-1/4" HHCS bolt (S-3886)
12
Horizontal bracing clip
5
7/16" flat washer (S-7548)
16
Main tower right leg
6
7/16" flange nut (S-9073)
4. Connect the main tower left and right legs by installing the horizontal bracings (14) to the horizontal
bracing clips (12) using 7/16" x 1-1/4" HHCS bolts (1), 7/16" flat washers (5) and 7/16" flange nuts
(6).
NOTE:
Install nuts (6) to the inside of the bracing (14) flanges.
Figure 3-5
Connecting the main tower legs with horizontal bracings
1
7/16" x 1-1/4" HHCS bolt (S-3886)
12
Horizontal bracing clip
5
7/16" flat washer (S-7548)
14
Horizontal bracing
6
7/16" flange nut (S-9073)
PNEG-2328
Grain Bin Eave Towers (30' - 48' Bins)
15