Chapter 3: Assembling the Tower
Assembling the Main Tower
1. Slide the main tower leg inserts (17) into the main tower legs (15 and 16) from the top, until the top
edges are flush.
Figure 3-2
Sliding the leg insert into the main tower leg
15
Main tower left leg
17
Main tower leg insert
16
Main tower right leg
2. Assemble the horizontal bracing clips (12) to the main tower left leg (15) using 7/16" x 1-1/4" HHCS
bolts (1), 7/16" flat washers (5) and 7/16" flange nuts (6).
NOTE:
Install nuts (6) to the inside of the leg (15) flanges.
Figure 3-3
Assembling the horizontal bracing clips to the main tower left leg
1
7/16" x 1-1/4" HHCS bolt (S-3886)
12
Horizontal bracing clip
5
7/16" flat washer (S-7548)
15
Main tower left leg
6
7/16" flange nut (S-9073)
14
PNEG-2328
Grain Bin Eave Towers (30' - 48' Bins)