6. Start-up

To start up a booster set Hydro 1000, follow this procedure:

1.

Connect water and electricity supplies.

2.

Check that the precharge pressure in the diaphragm tank is 
equal to the minimum cut-in pressure.

3.

Close the discharge valves of the pumps and prime the 
booster set and the suction pipe.

4.

Adjust the pressure switches according to the desired dis-
charge pressure.

5.

Check that the DIP switch setting corresponds to the number 
of pumps installed.

6.

Switch on the electricity supply.

7.

Start pump 1 by pressing the button on the front cover.

8.

Pump 1 will now start.

9.

Check the direction of rotation of the pump. In case of incor-
rect rotation, interchange two phases of the electricity supply.

10. Vent the pump while slowly opening its discharge valve.

11. Repeat points 7 to 10 for all pumps.

12. Release the pumps for operation by pressing the buttons on 

the front cover.

Hydro 1000 is now ready for operation.

7. Maintenance

7.1 Maintenance of booster set

See installation and operating instructions for CR pumps.

7.2 Maintenance of Control 1000

The Control 1000 is maintenance-free.

7.3 Checking the precharge pressure

To ensure reliable and correct operation, including the frequency 
of starts and stops, the precharge pressure of the diaphragm tank 
should be checked regularly (at least twice a year).

Содержание Hydro 1000

Страница 1: ...Hydro 1000 Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Страница 2: ...tives on the approximation of the laws of the EC Member States relating to Machinery 98 37 EC Standard used EN ISO 12100 Electromagnetic compatibility 89 336 EEC Standards used EN 61 000 6 2 and EN 61...

Страница 3: ...rks blocks of flats hotels industry hospitals schools etc 1 2 Operating conditions Liquid temperature Maximum 50 C Ambient temperature 0 C to 40 C Operating pressure Maximum 10 bar Minimum and maximum...

Страница 4: ...s connected Dry running alarm The red indicator light is on when the dry running alarm is activated The light goes out when the alarm is reset If automatic resetting is chosen the indica tor light goe...

Страница 5: ...en the inlet pressure level drops below the set value the pumps are cut out When the correct pressure level value is restored the pumps can be reset to operation auto matically or manually 4 5 Priming...

Страница 6: ...6 Note A pilot pump is the pump that starts first stops last is generally smaller than the other pumps smaller flow higher head is not to be alternated must be installed in position P1 Before changin...

Страница 7: ...more pumps will be cut in until the performance of the pumps in operation cor responds to the requirements When the water consumption falls the discharge pressure rises to the cut out pressure and th...

Страница 8: ...8 Pump 1 will now start 9 Check the direction of rotation of the pump In case of incor rect rotation interchange two phases of the electricity supply 10 Vent the pump while slowly opening its discharg...

Страница 9: ...e pressure Check the diaphragm tank precharge pressure 3 Frequent starts and stops a Incorrect setting of time delay TR 2 Set the time delay TR 2 accordingly b Incorrect setting of pressure switch Inc...

Страница 10: ...a Supply Voltage 3 x 400 V 6 10 50 Hz PE Pos Description Number 1 Suction manifold 1 2 Discharge manifold 1 3 Base frame 1 4 Stand 1 5 Control box 1 6 CR pump 2 4 7 Non return valve 1 per pump 8 Isola...

Страница 11: ...Sasso 4 I 20060 Truccazzano Milano Tel 39 02 95838112 Telefax 39 02 95309290 95838461 Japan GRUNDFOS Pumps K K 1 2 3 Shin Miyakoda Hamamatsu City Shizuoka pref 431 21 Phone 81 53 428 4760 Telefax 81...

Страница 12: ...www grundfos com Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence 96413144 0405 GB Repl 96413144 0902...

Отзывы: