background image

4

2.3 Monitoring and indication functions

The following functions are available:

Red indicator lights (LED) for indication of fault conditions:

- maximum pressure (if a pressure switch is installed),

- dry-running protection (if a pressure switch is installed),

- motor protection.

Green indicator lights (LED) for indication of operating condi-
tions:

- power on,

- automatic operation,

- pump in operation.

Potential-free changeover contact for fault indications.

2.4 Example of booster set Hydro 1000

3. Operation

3.1 CS 1000 front cover

The CS 1000 front cover shows all possible operating conditions.

Fig.

3

Grundfos Hydro 1000 CS

Four identical full-size mains-operated pumps and a dia-
phragm tank.

TM

00

 80

84 

239

6

One pump in operation.

TM

00

 80

85

 23

96

Three pumps in operation.

TM

0

0

 5

086

 2

396

Grundfos Hydro 1000 CS maintains an almost constant pres-
sure by cutting in/out the required number of pumps.
The CS 1000 alters the starting sequence of the pumps after 
each pump stop, thus giving all pumps equal operating time.
Pump changeover is automatic and depends on load and fault.

CS 1000

Q

stop 

H

H

start

H

Cut-out

Cut-in

H

start

Q

stop 

H

H

Cut-out

Cut-in

T

M

00

 97

38

 03

97

Button/

indicator light

Function

Power indication. The green indicator light 
is on when the electricity supply to the 
CS 1000 is connected.

Dry-running alarm. The red indicator light is 
on when the dry-running alarm is activated. 
The light goes out when the alarm is reset. 
If automatic resetting is chosen, the indica-
tor light goes out automatically when nor-
mal operating conditions are achieved.

Maximum pressure alarm. The red indicator 
light is on when maximum pressure is acti-
vated. The light goes out when the alarm is 
reset. If automatic resetting is chosen, the 
indicator light goes out automatically when 
normal operating conditions are achieved.

Reset button. Resets the dry-running alarm 
and the maximum pressure alarm if auto-
matic resetting has not been chosen.

Automatic operation. The green indicator 
light is on when the pump is released and 
ready for operation.

Pump alarm. The red indicator light is on 
when the thermal relay of the pump is acti-
vated. The pump is out of operation. The 
alarm can be reset on the thermal relay.

Pump in operation. The green indicator 
light is on when the pump is operating.

Auto button. When the auto button is 
pressed, the pump will be released for op-
eration and the indicator light for automatic 
operation will be lit.

Stop button. When the stop button is 
pressed, the pump will be taken out of op-
eration and the indicator light for automatic 
operation goes out.

Test button. The pump is operating as long 
as the test button is pressed. The maxi-
mum pressure and the dry-running protec-
tion are not activated as long as the button 
is pressed.

CS 1000 front cover

Содержание Hydro 1000

Страница 1: ...Hydro 1000 Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Страница 2: ...tives on the approximation of the laws of the EC Member States relating to Machinery 98 37 EC Standard used EN ISO 12100 Electromagnetic compatibility 89 336 EEC Standards used EN 61 000 6 2 and EN 61...

Страница 3: ...rks blocks of flats hotels industry hospitals schools etc 1 2 Operating conditions Liquid temperature Maximum 50 C Ambient temperature 0 C to 40 C Operating pressure Maximum 10 bar Minimum and maximum...

Страница 4: ...s connected Dry running alarm The red indicator light is on when the dry running alarm is activated The light goes out when the alarm is reset If automatic resetting is chosen the indica tor light goe...

Страница 5: ...en the inlet pressure level drops below the set value the pumps are cut out When the correct pressure level value is restored the pumps can be reset to operation auto matically or manually 4 5 Priming...

Страница 6: ...6 Note A pilot pump is the pump that starts first stops last is generally smaller than the other pumps smaller flow higher head is not to be alternated must be installed in position P1 Before changin...

Страница 7: ...more pumps will be cut in until the performance of the pumps in operation cor responds to the requirements When the water consumption falls the discharge pressure rises to the cut out pressure and th...

Страница 8: ...8 Pump 1 will now start 9 Check the direction of rotation of the pump In case of incor rect rotation interchange two phases of the electricity supply 10 Vent the pump while slowly opening its discharg...

Страница 9: ...e pressure Check the diaphragm tank precharge pressure 3 Frequent starts and stops a Incorrect setting of time delay TR 2 Set the time delay TR 2 accordingly b Incorrect setting of pressure switch Inc...

Страница 10: ...a Supply Voltage 3 x 400 V 6 10 50 Hz PE Pos Description Number 1 Suction manifold 1 2 Discharge manifold 1 3 Base frame 1 4 Stand 1 5 Control box 1 6 CR pump 2 4 7 Non return valve 1 per pump 8 Isola...

Страница 11: ...Sasso 4 I 20060 Truccazzano Milano Tel 39 02 95838112 Telefax 39 02 95309290 95838461 Japan GRUNDFOS Pumps K K 1 2 3 Shin Miyakoda Hamamatsu City Shizuoka pref 431 21 Phone 81 53 428 4760 Telefax 81...

Страница 12: ...www grundfos com Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence 96413144 0405 GB Repl 96413144 0902...

Отзывы: