background image

3

CONTENTS

Page

1.

General

3

1.1

Applications

3

1.2

Operating conditions

3

2.

Product description

3

2.1

Grundfos Hydro 1000

3

2.2

Grundfos Control 1000

3

2.3

Monitoring and indication functions

4

2.4

Example of booster set Hydro 1000

4

3.

Operation

4

3.1

CS 1000 front cover

4

4.

Installation

5

4.1

Location

5

4.2

Foundation

5

4.3

Pipework

5

4.4

Dry-running protection

5

4.5

Priming

5

4.6

Electrical connection

5

5.

Settings

5

5.1

Timers

5

5.2

Operation selection

6

5.3

Alarm resetting

7

5.4

Pressure setting

7

5.5

Pressure switch

7

5.6

Tank precharge pressure

7

6.

Start-up

8

7.

Maintenance

8

7.1

Maintenance of booster set

8

7.2

Maintenance of Control 1000

8

7.3

Checking the precharge pressure

8

8.

Fault finding chart

9

8.1

Emergency operation

9

9.

Parts list

10

10.

Technical data

10

10.1

Sound pressure level

10

10.2

Hydraulic data

10

10.3

Electrical data

10

Before beginning installation procedures, these in-
stallation and operating instructions should be stud-
ied carefully. The installation and operation should 
also be carried out in accordance with local regula-
tions and accepted codes of good practice.

1. General

1.1 Applications

Grundfos booster sets Hydro 1000 are designed for the transfer 
and pressure boosting of clean water in waterworks, blocks of 
flats, hotels, industry, hospitals, schools, etc.

1.2 Operating conditions

Liquid temperature:

M50°C.

Ambient temperature:

0°C to +40°C.

Operating pressure:

Maximum 10 bar.

Minimum and maximum
inlet pressures:

See installation and operating
instructions for CR pumps.

Liquid temperature and operating pressure may be limited by the 
diaphragm tank.

2. Product description

2.1 Grundfos Hydro 1000

The booster set consists of 2 to 4 pumps mounted on a common 
base frame, isolating valves, non-return valves, suction and dis-
charge manifolds with pressure switches and a control box com-
plete with the controller CS 1000. 

Note:

 A diaphragm tank must be included in the installation. Dia-

phragm tanks can be connected directly to the discharge mani-
fold.

Fig.  1

2.2 Grundfos Control 1000

The Grundfos Control 1000 controls a number of mains-operated 
pumps.

The Control 1000 always includes the controller CS 1000 and of-
fers the following functions:

Automatic cascade control of pumps.

Manual operation.

Pump and system monitoring functions:

- maximum pressure,

- pre-pressure / level,

- motor protection.

Display and indication functions:

- green indicator lights for operating indications and 

red indicator lights for fault indications,

- potential-free changeover contact for fault indications.

Fig.

2

T

M

00

 97

18

 02

97

TM

00

 97

38

 03

97

VALVE

CS 1000

PRESSURE GAUGE

NON-RETURN

VALVE

ISOLATING

PUMP

PRESSURE
SWITCH

Hydro 1000

Grundfos booster set Hydro 1000

CS 1000 front cover

Содержание Hydro 1000

Страница 1: ...Hydro 1000 Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Страница 2: ...tives on the approximation of the laws of the EC Member States relating to Machinery 98 37 EC Standard used EN ISO 12100 Electromagnetic compatibility 89 336 EEC Standards used EN 61 000 6 2 and EN 61...

Страница 3: ...rks blocks of flats hotels industry hospitals schools etc 1 2 Operating conditions Liquid temperature Maximum 50 C Ambient temperature 0 C to 40 C Operating pressure Maximum 10 bar Minimum and maximum...

Страница 4: ...s connected Dry running alarm The red indicator light is on when the dry running alarm is activated The light goes out when the alarm is reset If automatic resetting is chosen the indica tor light goe...

Страница 5: ...en the inlet pressure level drops below the set value the pumps are cut out When the correct pressure level value is restored the pumps can be reset to operation auto matically or manually 4 5 Priming...

Страница 6: ...6 Note A pilot pump is the pump that starts first stops last is generally smaller than the other pumps smaller flow higher head is not to be alternated must be installed in position P1 Before changin...

Страница 7: ...more pumps will be cut in until the performance of the pumps in operation cor responds to the requirements When the water consumption falls the discharge pressure rises to the cut out pressure and th...

Страница 8: ...8 Pump 1 will now start 9 Check the direction of rotation of the pump In case of incor rect rotation interchange two phases of the electricity supply 10 Vent the pump while slowly opening its discharg...

Страница 9: ...e pressure Check the diaphragm tank precharge pressure 3 Frequent starts and stops a Incorrect setting of time delay TR 2 Set the time delay TR 2 accordingly b Incorrect setting of pressure switch Inc...

Страница 10: ...a Supply Voltage 3 x 400 V 6 10 50 Hz PE Pos Description Number 1 Suction manifold 1 2 Discharge manifold 1 3 Base frame 1 4 Stand 1 5 Control box 1 6 CR pump 2 4 7 Non return valve 1 per pump 8 Isola...

Страница 11: ...Sasso 4 I 20060 Truccazzano Milano Tel 39 02 95838112 Telefax 39 02 95309290 95838461 Japan GRUNDFOS Pumps K K 1 2 3 Shin Miyakoda Hamamatsu City Shizuoka pref 431 21 Phone 81 53 428 4760 Telefax 81...

Страница 12: ...www grundfos com Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence 96413144 0405 GB Repl 96413144 0902...

Отзывы: