Start-up
28 | 80
B
A
_
T
D3
-B
M
0
0
2
e
n
_
0
0
4
_
so
ft
liQ
-MD
9.
Open the raw water shut-off valve.
10.
Open the soft water shut-off valve.
Water flows through the flushing water hose to the drain. This is normal
during start-up.
11.
Start the ventilation program.
» There is an automatic sequence of 11 program steps.
» This is followed by a 5-step functional check.
● The soft water sample must be determined for each exchanger.
12.
Remove cold water at the water draw-off point.
13.
Measure the soft water hardness (refer to chapter 6.6)
– left exchanger.
14.
Remove cold water at the water draw-off point.
Содержание softliQ:MD Series
Страница 1: ...We understand water Water softener softliQ MD Operation manual...
Страница 79: ......