background image

 

ARAMARK Manual 

                                                            Page 13 – Revision 10-31-21 

SERVICE REQUIREMENTS 

 

WARNING!

  

Read and understand the contents of this manual before attempting to service 

Aramark Countertop or Refresh Center. Failure to follow the instructions in this manual 

could result in death, serious personal injury, or severe property damage.  Only trained and 

qualified technicians should attempt to install, maintain, or service Waterlogic Equipment.

 

 

1.

 

Visually inspect all electrical and water connections for signs of wear or damage.  

 

DANGER!  

HIGH VOLTAGE ELECTRICAL HAZARD.  

Unplug before inspection and service. 

 

2.

 

Waterlogic recommends changing the UV Lamp every 12 months. 

 
NOTE:

  When replacing the UV Lamp Assembly

*

, the UV Lamp 

wiring harness must also be replaced.   

 

NOTE:

  The Glow Starter shown to the right may appear blackened 

which is normal.   

 

 

*

  

If the Water Treatment System has an S2 Starter, it is fully interchangeable with the UV 

     Lamp with Glow Starter.  

 

 

 

 

 

 

 

 

 

 

 

 

UV Lamp Assembly with S2 Starter

:   

Not available as a repair part 

S2 Starter 

UV Lamp Connectors 

UV Lamp Assembly with Glow Starter

 Part #’s:  

4-Watt Bulb 12-2350 (CT-2084) 
8-Watt Bulb 10-2350 (CT-2083)

 

Glow Starter 

UV Lamp Connectors 

A.

  Disconnect Lamp Male and Female 

Connection Clips from Ballast. 

 

 

B.  Remove the S2 Starter by pulling 

upwards.   
 

C.  Remove UV Lamp. 

D.  Install Glow Starter UV Lamp. 

 

E.  Connect UV Lamp Male and Female 

Connection Clips to Ballast.   

 

 

Switching from S2 Starter to existing Glow-Starter UV Lamp Assembly Instructions 

Содержание ARAMARK

Страница 1: ...every 12 months NOTE When replacing the UV Lamp Assembly the UV Lamp wiring harness must also be replaced NOTE The Glow Starter shown to the right may appear blackened which is normal If the Water Tre...

Страница 2: ...and contaminants to ensure proper operation Use a soft non abrasive cloth to clean 4 Inspect the Quartz Sleeve O ring for wear or damage and replace as necessary 5 Ensure there is adequate minimum of...

Страница 3: ...r and water to pass into the vent chamber as it is heated Water in the vent chamber is suctioned back through the outlet tube vent hole when water is dispensed Expansion of water as it is heated in th...

Страница 4: ...ective metal box on the rear of the Hot Tank As you look through the condenser coils on the rear of the unit you will see the Hot Tank located on the right hand side 5 Reach up behind the Hot Tank and...

Страница 5: ...x so it snaps back into its original position on the Hot Tank 8 Replace Panel on unit using Phillips head screws 9 Plug in the Power Cord 10 Make sure the Hot and Cold Tanks are filled with water BEFO...

Страница 6: ...Hot Tank is made from stainless steel Ensure descaling solution is compatible with stainless and always flush the Aramark Countertop or Refresh Center completely Dispose in an environmentally safe ma...

Страница 7: ...ING HOT WATER HAZARD The Aramark Countertop and Refresh Centers produce Hot Water up to 86 C 187 F Water above 52 C 125 F can cause severe burns or scalding Hot water should be dispensed carefully int...

Страница 8: ...tor External Capacitor New LG CSB035 LJCM Compressor Repair Replacement Parts for are not interchangeable with older other compressors Older version of LG compressor is obsolete and no longer availabl...

Страница 9: ...LT Carbon Block 10 CBC 1 Micron Lead and Cyst Reduction Inline Filter Optional FT 0063 Every 6 months or as required Local water conditions will determine proper filter type and maintenance schedule F...

Страница 10: ...ARAMARK Manual Page 22 Revision 10 31 21 ARAMARK COUNTERTOP DRAWING AND PARTS LIST Yellow Consumables Green Recommended spare parts...

Страница 11: ...commended Spare Parts 2 1 12 1360 Overload with Manual Reset 97 C 206 F Recommend stocking 2 each per every 10 units purchased HT 3012 Yes 2 2 12 1303 Hot Tank Thermostat 87 C 189 F Recommend stocking...

Страница 12: ...42 CN Yes 10 12 3130 Drip Tray Charcoal with Aramark Logo Recommend stocking 4 each per every 10 units purchased PL 1237 CN Yes Not Shown 10 3048 Faucet Nipple Blue with Screen Recommend stocking 2 ea...

Страница 13: ...No 15 12 3110 2L UV Cold Tank Assembly CT 2060 Yes 16 12 3185 Side Panel Silver ST 8241 Yes 17 12 3120 Front Upper Drip Tray Insert Panel when purchasing also request Hot Water Caution Label KB 11 to...

Страница 14: ...22A 1 CO 0020 L00 00 LG Compressor 120V R134A CSB035LJCM CO 0020 L00 00 Yes 22A 2 CO 0019 L00 00 Compressor Capacitor CO 0019 L00 00 Yes 22A 3 ST 0216 L00 00 Capacitor Bracket ST 0216 L00 00 Yes 22A...

Страница 15: ...noid Bracket ST 8244 Yes 29 Purchase from John Guest JG Equal Tee Connector P10208S PU 4011 No 30 Purchase from John Guest JG Reducing Elbow Connector 5 16 PI211008S PU 4007 No 31 Purchase from John G...

Страница 16: ...1101 Cold Tank Thermostat CT 2016 Yes 37 1 PL 0326 Cold Thermostat Cover Label PL 0326 L00 00 Yes 38 12 8061 Silver Back Panel ST 8216 Yes 39 12 3117 Power Transformer 120V EL 5003 A Yes Not Shown Pur...

Страница 17: ...ARAMARK Manual Page 29 Revision 10 31 21 ARAMARK REFRESH CENTERS DRAWING AND PARTS LIST Yellow Consumables Green Recommended spare parts Wetted Drawing...

Страница 18: ...yst Reduction Inline Filter Optional FT 0063 IL WLT X X X Yes FT 0053 Sediment Block 10 Sediment 20 Micron Inline Filter Optional FT 0053 IL WLT X X X Yes Recommended Spare Parts 2 1 12 1360 Overload...

Страница 19: ...0 2600 White Silicon Faucet O Ring Recommend stocking 2 each per every 10 units ordered CT 2007 X X X Yes 10 12 8057 Button Label Hot and Cold Recommend stocking 2 each per every 10 units ordered LP 7...

Страница 20: ...2 8615 PCB for Cold Water EN 6086 X Yes 15 1 10 3017 PCB Stand off Pin EN 6059 X X X Yes 16 12 3125 Front Upper Panel PL 1236 L00 SI X X X Yes 17 12 3220 Silver Side Panel ST 8192 CN X X X Yes 18 12 8...

Страница 21: ...NA Rubber O Ring for Filter Bracket PL 1208CN X X X No Verify compressor in machine before ordering parts as the Compressor P N CO 0020 L00 00 and 10 2200 CO 0001A and related parts are not interchan...

Страница 22: ...nsor 0 5mm ST 8207 CN X X X Yes 30 NA Leak Tray PL 1294 A X X X No 31 12 8004 Bottom Tray ST 8137 X X X Yes 32 10 3083 Unit Control Rubber Feet ST 8167CN X X X Yes 33 NA Back Panel Silver ST 8247 X X...

Страница 23: ...former UV 120V 60Hz EL 5003 A X X X Yes 41 12 1210 UV Lamp Retaining Threaded Nut PL 1128 X X X Yes 42 12 5245 PCB Fixing Bracket ST 8165 CN X X X Yes 43 12 8510 3 Minutes UV Timer PCB Hot and Cold AK...

Страница 24: ...as e from John Guest 48 10 3062 JG LLDPE Tube Blue 8mm John Guest P N PE 0806 100M B PU 4014 A X X X Yes 49 NA 5 16 x Reducing Elbow John Guest P N PI211008S PU 4007 A X X X Purchas e from John Guest...

Страница 25: ...would install into a desk or piece of furniture 1 Align Rails on the machine into the grooves on the underside of the top Slide the Top toward the rear of the unit until you hear it click into place 2...

Страница 26: ...ated on the underside of the unit UL requires all areas of access to wiring and high voltage components to be protected such that access requires the use of a tool When you install the Refresh Center...

Страница 27: ...tanks are filled with water 3 To fill the Hot and Cold Tanks depress the Water Dispensing Button until water flows from the Faucet requires about 60 seconds to fill the cold tank Once the Cold Tank is...

Страница 28: ...nstalled prior to connecting the unit to water Mounting the Cabinet 1 Inside the Cabinet locate the Hardware bag and Keys 2 To remove the Lower Panel lean the unit back and remove the two Philips head...

Страница 29: ...evision 10 31 21 3 Using the hardware supplied bolt the cabinet to the cooler Six total bolts washers and nuts are needed for this step however mounting of the back middle bolt and nut can be omitted...

Страница 30: ...urniture 1 Align rails on the machine into the grooves on the underside of the top Slide the top toward the rear of the unit until you hear it click into place 2 Once the top is installed and slid all...

Страница 31: ...quires all areas of access to wiring and high voltage components to be protected such that access requires the use of a tool When you install the Aramark Refresh Center in a customer location be sure...

Страница 32: ...the tanks are filled with water 3 To fill the Hot and Cold Tanks Depress the Dispensing Button until water flows from the faucet requires about 60 seconds to fill the Cold Tank Once the Cold Tank is...

Страница 33: ...ARAMARK Manual Page 45 Revision 10 31 21 ARAMARK CENTERS COUNTER TOP WATER FLOW DIAGRAM...

Страница 34: ...ARAMARK Manual Page 46 Revision 10 31 21 ARAMARK REFRESH CENTERS WATER FLOW DIAGRAM...

Страница 35: ...ew under the decal at the rear of the unit Remove the red portion of the Cold Tank Temperature label to access the adjustment screw The factory set point is 41 F and is indicated by the dot on sheet m...

Страница 36: ...ision 10 31 21 ARAMARK COUNTERTOP AND REFRESH CENTERS ELECTRICAL DIAGRAM DANGER HIGH VOLTAGE ELECTRICAL HAZARD PCB Printed Circuit Board contains High Voltage Only trained and qualified technicians sh...

Отзывы: