Malfunction
62 | 80
B
A
_
T
D3
-B
M
0
0
2
e
n
_
0
0
4
_
so
ft
liQ
-MD
Display shows
Explanation
Remedy
System overloaded
Capacity already used up prior
to end of regeneration
One exchanger is being
regenerated while the
other is already
exhausted.
Symbol on the left: Exchanger tank 1
Right symbol: Exchanger 2
Only displayed if detection is activated.
Reduce water withdrawal, if possible.
Malfunction rectifies itself
automatically after regeneration has
been completed.
Fault messages that may occur during start-up:
Display shows
Explanation
Remedy
Error during commissioning
(venting)
Time monitoring of the
venting (backwash) has
tripped.
No flow was detected at
the regeneration water
meter.
Check that the shut-off valves on the
connection block are open.
Error during start-up
(fill brine tank)
Time monitoring for
filling the brine tank has
been triggered.
Check whether the raw water shut-off
valve is open.
Confirm with Rectify.
Repeat the start-up.
Error during start-up
(chlorine current too low)
Flow monitoring during
test regeneration has
been triggered.
Fill the brine tank with salt tablets if
you have not already done so.
Confirm with Rectify.
Repeat the start-up.
Error during commissioning
(referencing)
Step monitoring
regeneration motor
or connecting cable
defective.
Confirm with Rectify.
Repeat the start-up.
Notify Grünbeck's technical service /
authorised service company if the
malfunction reoccurs.