![Grunbeck softliQ:MC Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/grunbeck/softliq-mc/softliq-mc_operating-manual_2270831041.webp)
Start-up
41 | 80
BA_TD
3-
BM
000e
n_
06
4_sof
tli
Q
-M
C
.docx
9.
Select Start-up START.
10.
Confirm with ENTER.
11.
Continue with chapter 6.1.3.
6.1.2
Manual start of the start-up program
If required, start the start-up program manually from the menu level.
Status level>Menu level>Start-up
1.
Confirm with ENTER.
2.
Press and hold ▲ and ▼ for 2 seconds.
6.1.3
Program flow of the start-up program
There may be wait periods during the start-up program. These are indicated in the
control unit by means of an hourglass symbol. Continuing with the program is only
possible upon completion of the wait period and the disappearance of the symbol.
Use the ▲ or ▼ keys to navigate through the program.
1.
Do not fill any water into the brine tank.
2.
Confirm with ▼.
3.
Fill salt tablets into the brine tank (refer to chapter 7.8).
4.
Confirm with ▼.
5.
Set the current time and the current date.
a
Set the desired value using▲ and ▼.
b
Confirm with ENTER.
The system moves to its reference point. In case the reference point has not
been reached until after the entry of the time, the remaining time will be
indicated in the display.
6.
Determine the raw water hardness. You have the following options to do so:
• Contact your water supply company and ask them what the value is.
• Determine the value by using the water test kit supplied with the system (refer
to chapter 7.7).
7.
Use ▲ and ▼ to set the value for the raw water hardness.
8.
Confirm with ENTER.
Содержание softliQ:MC
Страница 1: ...We understand water Water Softener softliQ MC Operation manual...
Страница 74: ...Notes 74 80 Notes...
Страница 75: ...Notes 75 80 Notes...
Страница 76: ...Notes 76 80 Notes...
Страница 79: ......