Iron / manganese removal
Demanganisation system GENO-mat MN-Z
Order no. 095 153 048-inter Edited by: nkes-mrie G:\BA-153048-INTER_095_GENO-MAT_MN-Z.DOCX
35
Maintenance work on demanganisation system GENO-mat MN-Z
Checklist
Please enter measured values. Confirm checks with OK or enter repair work performed.
Maintenance performed (date)
Start-up
Measured values
Water pressure [bar] upstream
and downstream of the system
Flow pressure [bar] upstream and
downstream of the system
Water meter reading [m³]
Iron/manganese inlet (measured)
Iron/manganese pure water
(measured)
Inspections and checks on control unit and control head
Initiation of backwash checked
Injector and sieve cleaned
Control head checked for leaks
Function of drive motor checked
System "regeneration and disinfection"
System treated with special gran-
ulate
Connections, hose connections, seals
Seals and hose connections
checked
Miscellaneous
Remarks
Customer service technician
Company
Work time certificate (no.)
Signature