background image

 

Deferrisation

 

GENO-mat FE-Z Deferrisation System 

 
 

Order no. 025 153 940-inter   Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC 

3.2 Operating  

personnel 

Only persons who have read and understood this operation manual 
are permitted to work with the system. The safety guidelines are to 
be strictly adhered to. 

 

3.3 Designated  

application 

The system may only be used for the purpose outlined in the product 
description (chapter C). The guidelines in this operation manual as 
well as the applicable local guidelines concerning the drinking water 
protection, accident prevention and occupational safety must be ad-
hered to.  
In addition, appropriate application also implies that the system may 
only be operated when it is in proper working order.  
Any malfunctions must be repaired at once. 

 

3.4 Protection from 

water damage  

 

 

 

Warning! 

In order to properly protect the installation site from water 

damage: 
a) a sufficiently dimensioned floor drain system must be available or 
b) a water stop device (see chapter C Accessories) must be in-

stalled.  

 

 

3.5 Indication of 

specific dangers 

Danger due to electrical energy! 

 Do not touch electrical parts with 

wet hands! Disconnect the system from mains before starting work 
on electrical parts of the system. Have qualified experts replace 
damaged cables immediately. 
Danger due to mechanical energy! System parts may be subject to 
overpressure. Danger of injury and damage to property due to es-
caping water and unexpected movement of system parts. 

 Check 

pressure pipes regularly. Depressurise the system before starting 
repair or maintenance work on the system. 

Hazardous to health due to contaminated drinking water! 

 The 

system may only be installed by a specialist company. The operation 
manual must be strictly adhered to! Ensure that there is sufficient 
flow. The pertinent guidelines must be followed for starting-up after 
extended periods of standstill. Inspections and maintenance must be 
performed at the intervals specified!  

 

Note: 

By concluding a maintenance contract, you ensure that all of 

the required tasks are performed on time. You may perform the inter-
im inspections yourself. 

 

Содержание GENO-mat FE-Z 20/10

Страница 1: ...Operation Manual GENO mat FE Z Deferrisation system Edition September 2018 Order no 025 153 940 inter...

Страница 2: ...tandards 2 Intended use field of application 3 Function C Product description 12 1 Type plate 2 Technical specifications 3 Intended use 4 Scope of delivery 5 Optional accessories 6 Consumables D Insta...

Страница 3: ...tions into foreign languages electronic storage or copying even in part of this operation manual are only permitted with the explicit written approval of Gr nbeck Wasseraufbereitung GmbH Any type of d...

Страница 4: ...void Manufacturer Gr nbeck Wasseraufbereitung GmbH Josef Gr nbeck Str 1 89420 Hoechstaedt Do Germany Responsible for documentation Markus P pperl Description of the device Deferrisation system Device...

Страница 5: ...systems with the required care This operation manual assists you with important information Therefore please read the complete manual before installing operating or maintaining your system Customer s...

Страница 6: ...adhere to this information will cause serious or life threatening injuries extreme damage to property or inadmissible contamination of the drinking water Warning Failure to adhere to this information...

Страница 7: ...available or b a water stop device see chapter C Accessories must be in stalled 3 5 Indication of specific dangers Danger due to electrical energy Do not touch electrical parts with wet hands Disconne...

Страница 8: ...sposal Comply with the applicable national regulations 5 1 Packaging Dispose of the packaging in an environmentally sound manner 5 2 Product If this symbol crossed out waste bin is on the product Euro...

Страница 9: ...Z deferrisation systems are used for the oxida tion of dissolved iron in the raw water The systems are used for pri vate water supply plants up to maximum values of 3 0 mg l of iron If the systems are...

Страница 10: ...water outlet into the piping system 3 2 Backwashing During the backwash process the filter bed is forcibly flushed from bottom to top and thus loosened up Impurities retained during the filtration pr...

Страница 11: ...ocated on the GENO mat FE Z control valve Que ries and orders will be processed faster if you are able to provide the information listed on your system s type plate Please copy the indi cated informat...

Страница 12: ...g on the iron concentration m h 1 5 2 0 3 0 4 0 5 0 6 0 8 0 Power supply V Hz 230 50 Connected load VA 10 Protection protection class IP 54 Performance data Nominal pressure PN 10 Min max operating pr...

Страница 13: ...special granulate g 105 175 210 350 350 700 1050 Regeneration disinfection interval Regeneration as required disinfection at the latest after 6 months Concentration of preparation 0 35 Total waste wa...

Страница 14: ...is used the GENO oxi plus amount bust be subtracted from the preparation amount Filter layer III Top Filter layer I Bot tom Fig C 2 Filling of filter layers 3 Intended use The system is adjusted to th...

Страница 15: ...egeneration solution Tank has integrated suction device Regeneration device 100 litre FE Z 20 10 FE Z 40 18 153 094 Regeneration device 300 litre FE Z 50 19 FE Z 60 20 153 095 Mounting kit 1 for conve...

Страница 16: ...st glass with 3 chambers and scale Test tablets 0 0 mg l 0 8 mg l 30 tablets Test tablets 0 1 mg l 10 mg l 30 tablets 170 150 6 3 Spare filter filling complete Refer to table C 1 Technical specificati...

Страница 17: ...depending on the iron concentration m h 1 5 2 0 3 0 4 0 5 0 6 0 8 0 Power supply V Hz 230 50 Connected load VA 10 Protection protection class IP 54 Dimensions and weights1 Total height mm 1360 1620 16...

Страница 18: ...company as per 12 2 AVBWasserV German Ordinance on General Conditions for the Supply of Water Observe local and general installation guidelines Provide a drain connection to discharge the backwash wa...

Страница 19: ...board l 5 8 15 18 36 45 88 1 All indications are approximate Filter layer III Top Filter layer I Bottom Fig D 1 Filling of filter layers Centre rising pipe Fill with filter material 1 Fill filter tank...

Страница 20: ...hers on site Control valve operating voltage Drinking water filter BOXER K Fig D 2 a Erection drawing GENO mat FE Z deferrisation system Dimensions in Fig D 2 a Extract from table D 1 GENO mat FE Z de...

Страница 21: ...re is a free outlet min 20mm to the drain Secure the hose with suitable fittings to prevent the hose from moving about regeneration water is pressurised Caution Danger of damage and malfunctions due t...

Страница 22: ...water system immediately prior to commissioning 1 How to start up the system 1 Open the valve at the raw water inlet 2 Open the valve at the pure water outlet 3 Perform a visual check Ensure that no w...

Страница 23: ...e preset time for the backwash 02 00 should be unfavourable for internal reasons set a time which deviates from the current time at the 24 hour disk in order to adjust the starting time for the backwa...

Страница 24: ...e Day disk Steel switching pin in home position moved to centre point in switch position moved outwards Fig F 1 Control unit and operating elements front view 2 Push the switching pin Fig F 1 Item 5 o...

Страница 25: ...ing mode the distance between the reference arrow Fig F 1 Item 3 and the following switching pin which is turned outwards is an indication for the number of days until the next backwash 1 4 How to rel...

Страница 26: ...te must be strictly adhered to DIN EN 806 5 stipulates Inspection every 2 months Maintenance every 6 months Maintenance must be performed by the Gr nbeck s customer service authorised service company...

Страница 27: ...echnician records all maintenance and repair work performed In case of malfunctions this log helps to identify possible sources of error In addition the log documents the proper system maintenance Mak...

Страница 28: ...ti ties refer to Table G 1 We recommend installing a filling tap in the pure water pipe for this purpose Pour the GENO Spezialgranulat special granulate 1 or GENO oxi plus into the tank and mix by mea...

Страница 29: ...ig G 1 picture 1 and the actuator of the control piston has stopped Unplug mains plug Open the ball valve on the back of the control valve and suck the regeneration agent from the connected regenerati...

Страница 30: ...l When starting up the system make sure to record all data on the cover sheet of the operation log and fill in the first column of the check list The customer service technician will fill in a column...

Страница 31: ...GENO MAT_FE Z DOC 31 5 Operation log Customer Name Address GENO mat FE Z deferrisation system Please check appropriate box Serial number Installed by Filter Make Type 20 10 25 13 30 14 40 17 40 18 50...

Страница 32: ...eam and downstream of the system Flow pressure bar upstream and downstream of the system Water meter reading m Iron inlet measured Iron pure water measured Inspections and checks of control unit and c...

Страница 33: ...and downstream of the system Flow pressure bar upstream and downstream of the system Water meter reading m Iron inlet measured Iron pure water measured Inspections and checks of control unit and contr...

Страница 34: ...and downstream of the system Flow pressure bar upstream and downstream of the system Water meter reading m Iron inlet measured Iron pure water measured Inspections and checks of control unit and contr...

Страница 35: ...and downstream of the system Flow pressure bar upstream and downstream of the system Water meter reading m Iron inlet measured Iron pure water measured Inspections and checks of control unit and contr...

Отзывы: