Deferrisation
GENO-mat FE-Z Deferrisation System
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
20
3 | How to connect the system
1. Establish water connection as described in the erection drawing
(fig. D-2 (a) (b) while observing the guidelines and recommenda-
tions given in section 1.
Raw water
Pure water
Grünbeck‘s
limits of supply
diagram
Pump (provided by others)
Regeneration tank
for deferrisation (option)
GENO-mat
FE-Z deferrisation
system incl. filter material
Membrane expansion vessel
(provided by others)
Sampling valve
(by others on site)
Pressure gauge outlet pressure
(by others on site))
Pressure gauge inlet pressure
(by others on site)
Control valve operating voltage
Drinking water filter BOXER K
Fig. D-2 (a) : Erection drawing GENO-mat
FE-Z deferrisation system
Dimensions in Fig. D-2 (a); Extract from table D-1
GENO-mat
FE-Z deferrisation system
20/10 25/13 30/14 40/17 40/18 50/19 60/20
Dimensions and weights
1)
A Total height
[mm] 1360
1620
1620
1900
1900
1870
2100
B Exchanger tank
[mm] 210
260
340
370
420
550
620
C Regeneration tank
[mm]
465
680
D Height regeneration tank
[mm]
840
1010
E Connection height/raw water piping
[mm] 1160
1420
1420
1710
1710
1680
1910
F Connection height/pure water piping
[mm] 1210
1470
1470
1735
1735
1705
1935
G Distance to wall
[mm] 200
230
280
280
300
365
405
H Foundation depth
[mm] 400
450
500
500
550
600
650
I
Foundation length
[mm] 1850
1950
2050
2050
2100
2250
2350
K Operating weight (incl. water)
[kg]
50
85
150
200
240
425
580
1 )
All indications are approximate.