Deferrisation
GENO-mat FE-Z Deferrisation System
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
21
Caution!
Dirt and corrosion particles might damage the system
(control valve). Flush the supply pipe prior to start-up.
2. Establish waste water connection as per DIN EN 1717. Shorten
the rinse water hose to the correct length and guide it to the drain.
Ensure there is a free outlet (min. 20mm) to the drain. Secure the
hose with suitable fittings to prevent the hose from moving about
(regeneration water is pressurised).
Caution!
Danger of damage and malfunctions due to a waste water
backflow. Therefore, do not bend the hose and do not lead it higher
than the system height.
3. Connect the mains plug to the socket (cf. 1.2).
4. Water the system
In order to prevent the filter material from being washed out, it
must be watered for 24 hours.
Control valve
Raw water inlet
Filter tank
Raw water outlet
Drain connection
Fig. D-2 (b): GENO-mat FE-Z deferrisation system, rear view