background image

 

Filtration/Deacidification 

Filter systems GENO-mat KF-Z / MS-Z / AK-Z 

Deacidification systems GENO-mat TE-Z 

 
 

Order no. 035 129 950-inter Edited by: nkes-mrie G:\BA-129950-INTER_035_FILTERANLAGEN_GENO-MAT.DOCX 

11 

Deacidification system 
TE-Z 

Corresponding to its carbonate hardness, all water contains a cer-
tain amount of free carbon dioxide which is necessary to dissolve 
the carbonate hardness present in the water. If there is more free 
carbon dioxide contained in the water than necessary, the water is 
characterised as tending to precipitate lime. This aggressive carbon-
ic acid prevents the formation of protective scale/rust layers in the 
piping and is therefore removed by means of a deacidification filter. 
At the same time that the acid is removed, minor impurities are also 
removed by filtration. 

We would like to point out explicitly that due to the limited amount of 
filtration material available, only a partial deacidification can be 
achieved. 

We therefore recommend installing an EXADOS dosing unit down-
stream of the deacidification filter in order to add EXADOS-spezial. 

In order to prevent the filter material from clogging and to flush out 
impurities, it is necessary to backwash the filter. The backwash is 
carried out from the bottom to the top, opposite to the regular direc-
tion of flow.  

The Hydrolit-Ca deacidification material used is consumed based on 
the hydration of the excess carbon dioxide. (Consumption per g of 
converted CO

2

 approx. 2.5 g). 

It is therefore necessary to check the filling level from time to time 
and to refill, if necessary. The system must be flushed through every 
time it is refilled. 

If an increased bacterial count is to be expected from the well water, 
we recommend to have a disinfection performed at regular intervals 
by our technical service. 

Содержание GENO-mat AK-Z

Страница 1: ...Operation manual Filter systems GENO mat KF Z MS Z AK Z Deacidification systems GENO mat TE Z Edition September 2018 Order no 035 129 950 inter...

Страница 2: ...asic information 9 1 Laws regulations standards 2 Designated application area of application 3 Function C Product description 13 1 Type plate 2 Technical specifications 3 Intended use 4 Scope of deliv...

Страница 3: ...technical progress Reprints translations into foreign languages electronic storage or copying even in part of this operation manual are only permitted with the explicit written approval of Gr nbeck Wa...

Страница 4: ...ficate is void Manufacturer Gr nbeck Wasseraufbereitung GmbH Josef Gr nbeck Str 1 89420 Hoechstaedt Do Germany Responsible for documen tation Markus P pperl Description of the system Filter systems De...

Страница 5: ...your water treatment systems with the required care This operation manual assists you with important information Therefore carefully and thoroughly read the operation manual before installing operati...

Страница 6: ...g of the system Danger Failure to adhere to this information will cause serious or life threatening injuries extreme damage to property or inadmissible contamination of the drinking water Warning Fail...

Страница 7: ...fety device see chapter C Accessories must be installed Warning Floor drains that discharge to a lifting system do not work in case of a power failure 3 5 Indication of specific dangers Danger due to...

Страница 8: ...as indicated on the packing 5 Disposal Comply with the applicable national regulations 5 1 Packaging Dispose of the packaging in an environmentally sound manner 5 2 Product If this symbol crossed out...

Страница 9: ...stances such as sand etc Heavy metal compounds in dissolved form such as iron and manga nese however cannot be removed The filter must be backwashed if there is an accumulation of dirt par ticles and...

Страница 10: ...the available free chlorine via surface reaction The chloride thus produced does not clog up the activated carbon filter but is discharged with the water The surface reaction capacity is reduced over...

Страница 11: ...tration We would like to point out explicitly that due to the limited amount of filtration material available only a partial deacidification can be achieved We therefore recommend installing an EXADOS...

Страница 12: ...he lower distributing nozzle and the riser pipe through the pure water outlet into the piping system 3 2 Backwash During the backwash process the filter bed is forcibly flushed from bottom to top and...

Страница 13: ...s located on the control valve of the GENO mat filter deacidification system In order to speed up the processing of your inquiries or orders please specify the data shown on the type plate when contac...

Страница 14: ...r during the back wash process It is equipped with a timer control The backwash is released after a set time interval All system data are summarized on the reverse in table C 1 The data refers to the...

Страница 15: ...90 180 267 Hydro anthrasite H 0 6 1 6 III l 8 17 26 24 64 50 78 Filter material AK Z Quartz gravel 3 0 5 6 I kg 9 15 20 20 20 30 30 Hydrafin CC 8 x 30 0 5 2 5 II kg 10 16 25 40 50 90 140 Filter materi...

Страница 16: ...ructions and all safety guide lines applying at the installation site be observed Furthermore the maintenance and inspection intervals have to be observed 4 Design 5 cycle control valve made of red br...

Страница 17: ...contact your local Gr nbeck representative or Gr nbeck s headquarters in Hoechstaedt for details Mounting kit 1 for convenient hydraulic connection Compact valve block R 1 internal thread integrated b...

Страница 18: ...mables in order to ensure the reliable opera tion of the system 7 1 Wearing parts In case of heavy duty seals and control pistons are subject to a cer tain wear and tear Wearing parts are listed below...

Страница 19: ...The installation infor mation described below is also illustrated in fig D 2 Binding rules The installation of the GENO mat filter deacidification systems rep resents a major interference with the dr...

Страница 20: ...couple with light switch 2 Preliminary Work 1 Unpack all system components 2 Check for completeness and perfect condition 3 Place the filter tank at the designated location Note Filter deacidificatio...

Страница 21: ...ling volumes and consumption data Bottom filter layer I quartz gravel 3 0 5 6T kg 9 15 20 30 20 67 100 Bottom filter layer I quartz gravel 3 0 5 6T l 6 11 14 21 14 48 71 Bottom filter layer I dimensio...

Страница 22: ...0 590 540 460 530 Free board approx l 6 24 21 32 32 64 90 1 All indications are approximate Centre riser pipe fill with filter material 1 Fill filter tank up to 50 with water 2 Check whether the riser...

Страница 23: ...n as described in the erection draw ing fig D 2 a b Observe all requirements and general installa tion instructions Raw water Pure water Gr nbeck Limits of supply diagram Pump provided by others Contr...

Страница 24: ...500 500 550 600 650 K Foundation length mm 705 755 860 860 900 1030 1110 1 All indications are approximate Caution Dirt and corrosion particles might damage the system control valve Flush the supply p...

Страница 25: ...K Z Deacidification systems GENO mat TE Z Order no 035 129 950 inter Edited by nkes mrie G BA 129950 INTER_035_FILTERANLAGEN_GENO MAT DOCX 25 Control valve Raw water inlet Filter tank Pure water outle...

Страница 26: ...be connected to the drinking water system immediately prior to com missioning 1 How to start up the system 1 Open the valve at the raw water inlet 2 Open the valve at the pure water outlet 3 Perform a...

Страница 27: ...e red button Fig F 1 Item 6 Note In case the preset time for the backwash 2 00 am should be unfavourable for internal reasons set a time which deviates from the current time at the 24 hour disk in ord...

Страница 28: ...e point for operating state white Day disk Steel switching pin in home position moved to centre point in switch position moved outwards Fig F 1 Control unit and operating elements front view 2 Push th...

Страница 29: ...backwash In the operating mode the distance between the reference arrow Fig F 1 Item 3 and the following switching pin which is turned outwards is an indication for the number of days until the next...

Страница 30: ...spection every 2 months Maintenance every 6 months Maintenance must be performed by the Gr nbeck s customer service authorised service company or by a specialised company An operation log must be kept...

Страница 31: ...this log helps to identify possible sources of error In addition the log documents the proper system maintenance Make sure that all maintenance work is recorded in the operation log Summary Maintenan...

Страница 32: ...as stopped Unplug mains plug Open the ball valve on the back of the control valve and suck the regeneration agent from the connected regeneration tank Close the ball valve again after the regeneration...

Страница 33: ...G item 5 of this operation manual When starting up the system make sure to record all data on the cover sheet of the operation log and fill in the first column of the check list The customer service t...

Страница 34: ...ltration Deacidification Filter systems GENO mat KF Z MS Z AK Z Deacidification systems GENO mat TE Z Order no 035 129 950 inter Edited by nkes mrie G BA 129950 INTER_035_FILTERANLAGEN_GENO MAT DOCX 3...

Страница 35: ...INTER_035_FILTERANLAGEN_GENO MAT DOCX 35 5 Operation log Customer Name Address GENO mat filter deacidification systems KF Z MS Z AK Z TE Z please check appropriate box Serial number Installed by Filte...

Страница 36: ...e performed date Start up Measured values Water pressure bar upstream and downstream of the system Flow pressure bar upstream and downstream of the system Water meter reading m Inspections and checks...

Страница 37: ...nance performed date Measured values Water pressure bar upstream and downstream of the system Flow pressure bar upstream and downstream of the system Water meter reading m Inspections and checks of co...

Страница 38: ...nance performed date Measured values Water pressure bar upstream and downstream of the system Flow pressure bar upstream and downstream of the system Water meter reading m Inspections and checks of co...

Страница 39: ...nance performed date Measured values Water pressure bar upstream and downstream of the system Flow pressure bar upstream and downstream of the system Water meter reading m Inspections and checks of co...

Отзывы: