background image

14

GROWSPAN

 ROUND ECONOMY HIGH TUNNELS

Revision date: 01.01.20

4.  Once the main cover is in place and centered on the 

frame, begin at the peak of one end rafter and install 

the wire spring into the U-Channel to secure the cover. 

 

 

WEAR EYE PROTECTION WHEN INSTALLING  

 

THE WIRE SPRING! 

 

ATTENTION:

 Center the main cover front to back and 

side-to-side to ensure that enough cover material is 

present to lock into the U-Channel. 

The excess cover 

along each side is rolled up when the roll-up side 

assemblies are installed.

 

 

The rope can remain in place to temporarily secure 

the cover if needed. Remove the ropes as the cover is 

secured to the frame. 

 

Photos show installing the spring into the U-Channel on 

the outside of a frame. The process is the same for the 

U-Channel attached to the top of the end rafters.

5.  Continue adding the spring into the U-Channel at the 

top of the first end rafter. Ensure that an even amount 

of the cover is exposed and maintained along the edge 

of the frame as it is attached. 

 

NOTE:

 The cover material is cut longer/wider than is 

required to cover the frame. For easier installation, 

allow approximately 10" to extend past the edge of the 

end rafter as the cover is secured in place.

6.  Continue down both edges of the first end rafter 

until the entire length of the end of the main cover is 

secured in place.

7.  Stretch the cover to the other end of the building and 

repeat the steps to secure the main cover in the U-

Channel. 

 

NOTE:

 Pull the cover tight as the wire spring is inserted 

into the U-Channel. 

WEAR EYE PROTECTION!

8.  After the cover is stretched end-to-end and secured 

using the spring and U-Channel, move to one side 

of the frame and repeat the steps to anchor the main 

cover to the first side.  

 

Begin at one end of the U-Channel and work toward 

the other. It is also possible to begin at the middle of 

each side and work toward each end. 

 

NOTE:

 Maintain an even length along the side. The 

final stretching of the cover takes place when the last 

side is secured.

9.  After securing the first side, move to the remaining side 

and secure it in place. 

 

IMPORTANT:

 

DO NOT REMOVE TOO MUCH OF THE 

EXCESS COVER MATERIAL AT EACH END.

 Some 

excess main cover material–the material that extends 

beyond the end rafters–should remain in place. If the 

main cover needs stretched in the future, remove the 

spring from the U-Channel, grasp the excess material, 

pull the cover tight, and reinstall the spring. 

 

The excess material along the sides is rolled up in the 

roll-up side assembly.

10. Once the main cover is installed and secured in the  

U-Channel, continue with the 

Install the Roll-up Side 

Assemblies

 procedure.

Roll-up Portion

of the Cover

Содержание PB01700R6

Страница 1: ...s a different length but similar model Economy high tunnels include film roof and film end panels STK DIMENSIONS PB01700R6 26 W x 12 H x 48 L PB01710R6 26 W x 12 H x 96 L 2020 GrowSpan All Rights Rese...

Страница 2: ...manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and pre...

Страница 3: ...equipped This applies to fabric covers that stretch over the frame assembly Your shelter may include roof panels or side panels or both 11 Read the Care and Maintenance information at the end of thes...

Страница 4: ...ed for buildings with roll up sides Materials for baseboards and ribbon boards are not included and are supplied by customer ATTENTION Fasteners to secure boards to building frame are included Recomme...

Страница 5: ...Screw Tek Screw Rafter The following graphics and photos will help you identify the different parts Some parts are not shown Swaged Plain Swaged and Plain Rafter Sections 102198 U Channel Spring CC62...

Страница 6: ...ly procedure 2 Assemble the rafters and frame and square the frame 3 Prepare and attach end panels 4 Attach main cover and roll up side crank assembly Ground Level End Rafter Inside Rafter Baseboards...

Страница 7: ...ore driving the remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter T...

Страница 8: ...crews so they will not touch the cover once it is installed This is typically on the backside of the rafter which will be the surface visible from the inside of the high tunnel once the frame is assem...

Страница 9: ...the purlin pipe in the joint where the rafter pipes are connected to keep purlins aligned during assembly 7 Repeat the previous step to install a second purlin section See the above diagram for detai...

Страница 10: ...ign with the center of the end rafter for best results If the purlin is too short to fit into the rafter end clamps without pulling the end rafter out of plumb first verify you have the correct pipe I...

Страница 11: ...Continue by installing the remaining pipe and clamps BASEBOARD INSTALLATION RECOMMENDED Gather the parts Treated or recycled plastic lumber supplied by customer Recommended 2 x 6 1 4 x 4 carriage bolt...

Страница 12: ...r supplied wood screws to secure U channel to ribbon board Do not use Tek screws to attach U Channel to wood NO RIBBON BOARD Attach one section of the poly latch U Channel to the side of the frame usi...

Страница 13: ...nd pull the cover into place Center cover side to side and end to end IMPORTANT To prevent damage to the main cover during installation additional personnel and lifts may be needed INSTALL POLY LATCH...

Страница 14: ...h edges of the first end rafter until the entire length of the end of the main cover is secured in place 7 Stretch the cover to the other end of the building and repeat the steps to secure the main co...

Страница 15: ...cover 3 Assemble and install the crank assembly 4 Install the Anti Billow Rope system 5 Test the operation of the roll up side 4 Place the assembled conduit at the base of the side where the end of t...

Страница 16: ...cted using wood boards under each rafter foot or if baseboards were installed If the shelter was constructed on concrete footings a concrete slab or on bare ground alternative steps must be taken by t...

Страница 17: ...fore reassembling For replacement or missing parts call 1 800 245 9881 for assistance 4 Attach the remaining eyebolts using the diagram above as a pattern guide 5 Once all eyebolts are installed in th...

Страница 18: ...01 20 QUICK START GUIDE 26 Wide Round Economy High Tunnels 26 0 Width 12 6 15 16 Heigth F FR RO ON NT T Grid Represents 12 Squares Ground Level Diagram shows a different length but similar model Econ...

Страница 19: ...01 26R1602 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 ATTENTION Except fo...

Страница 20: ...Y HIGH TUNNELS Revision date 01 01 20 7 131S075 1 131P0735 48 0 Length Customer Supplied Baseboards Customer Supplied Ribbon Boards Purlin Run 6 0 on center Rafter Spacing center to center SIDE PROFIL...

Страница 21: ...HIGH TUNNELS Revision date 01 01 20 SIDE PROFILE PB01710R6 6 0 on center Rafter Spacing 96 0 Length center to center 15 131S075 1 131P0735 Purlin Run Customer Supplied Baseboards Customer Supplied Ri...

Страница 22: ...View 1 End Rafter Purlin Connection Purlin 102548 Rafter View 2 Mid Rafter Purlin Connection Purlin ATTENTION Install a Tek screw through each clamp into the rafter and through each clamp into the pu...

Страница 23: ...23 GROWSPAN ROUND ECONOMY HIGH TUNNELS Revision date 01 01 20 Space below is reserved for customer notes...

Отзывы: