INSTALL MAIN COVER

Gather the parts:
•  Main cover
•  Ropes long enough to reach over the frame (provided 

by customer)

•  U-Channel Spring (102198)
•  Box cutter or utility knife 

Assembly Procedure

 

After attaching the poly latch U-Channel to the frame, 

unpack the main cover and pull into place. Ropes or straps 

are typically used to pull the main cover onto and over the 

frame. Ropes may not be needed for some buildings.

WARNING: 

To prevent damage to the cover and to 

prevent serious personal injury, DO NOT attempt to 

install the main cover on windy or stormy days.

1.  Unpack the main cover and position it at the base along 

one side of the frame.

2.  Make small holes along the edge of the cover at evenly 

spaced intervals and tie rope to the cover. (The length 

of the cover determines the number of holes that are 

needed to attach the ropes.) 

 

NOTE:

 The ropes must be long enough to reach over 

the top of the building to the other side. Long buildings 

will require additional ropes to prevent tearing the main 

cover when it is pulled into place.

3.  After tying the ropes to the main cover, throw the ropes 

over the top of the frame and pull the cover into place. 

Center cover side-to-side and end-to-end. 

 

IMPORTANT:

 To prevent damage to the main cover 

during installation, additional personnel and lifts may be 

needed.

INSTALL POLY LATCH U-CHANNEL (Continued)

Shelter shown above may be a different length than the 

actual model.

U-Channel

End Rafter

Begin U-Channel for 

end rafter here.

3.  Repeat these steps for the remaining side.
4.  After attaching the poly latch U-Channel to the sides of 

the frame, use Tek screws to attach the U-Channel to 

the top of one end rafter. 

Space screws at 24".

 

 

ATTENTION: 

The poly latch U-Channel will bend with 

the curve of the rafter as it is attached. The U-Channel 

runs from the poly latch U-Channel attached to one 

side of the frame to the U-Channel attached to the 

other side of the frame.

5.  Repeat the steps to attach the U-Channel to the top 

of the remaining end rafter and continue with the main 

cover installation.

2.  Continue to attach the U-Channel sections to the 

rafters (or ribbon board if used) and work toward the 

other end of the frame. Cut the last section of  

U-Channel to the required length so that it is flush with 

the outside edge of the end rafter.

NOTE:

 Inset shows the use of a ribbon board. 

U-channel can be attached directly to rafters using 

FA4482B Tek screws when ribbon board is not used.

Ribbon Board

FAH009B bolt installed 

through U-channel, 

board and rafter. 

Содержание PB01700R6

Страница 1: ...s a different length but similar model Economy high tunnels include film roof and film end panels STK DIMENSIONS PB01700R6 26 W x 12 H x 48 L PB01710R6 26 W x 12 H x 96 L 2020 GrowSpan All Rights Rese...

Страница 2: ...manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and pre...

Страница 3: ...equipped This applies to fabric covers that stretch over the frame assembly Your shelter may include roof panels or side panels or both 11 Read the Care and Maintenance information at the end of thes...

Страница 4: ...ed for buildings with roll up sides Materials for baseboards and ribbon boards are not included and are supplied by customer ATTENTION Fasteners to secure boards to building frame are included Recomme...

Страница 5: ...Screw Tek Screw Rafter The following graphics and photos will help you identify the different parts Some parts are not shown Swaged Plain Swaged and Plain Rafter Sections 102198 U Channel Spring CC62...

Страница 6: ...ly procedure 2 Assemble the rafters and frame and square the frame 3 Prepare and attach end panels 4 Attach main cover and roll up side crank assembly Ground Level End Rafter Inside Rafter Baseboards...

Страница 7: ...ore driving the remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter T...

Страница 8: ...crews so they will not touch the cover once it is installed This is typically on the backside of the rafter which will be the surface visible from the inside of the high tunnel once the frame is assem...

Страница 9: ...the purlin pipe in the joint where the rafter pipes are connected to keep purlins aligned during assembly 7 Repeat the previous step to install a second purlin section See the above diagram for detai...

Страница 10: ...ign with the center of the end rafter for best results If the purlin is too short to fit into the rafter end clamps without pulling the end rafter out of plumb first verify you have the correct pipe I...

Страница 11: ...Continue by installing the remaining pipe and clamps BASEBOARD INSTALLATION RECOMMENDED Gather the parts Treated or recycled plastic lumber supplied by customer Recommended 2 x 6 1 4 x 4 carriage bolt...

Страница 12: ...r supplied wood screws to secure U channel to ribbon board Do not use Tek screws to attach U Channel to wood NO RIBBON BOARD Attach one section of the poly latch U Channel to the side of the frame usi...

Страница 13: ...nd pull the cover into place Center cover side to side and end to end IMPORTANT To prevent damage to the main cover during installation additional personnel and lifts may be needed INSTALL POLY LATCH...

Страница 14: ...h edges of the first end rafter until the entire length of the end of the main cover is secured in place 7 Stretch the cover to the other end of the building and repeat the steps to secure the main co...

Страница 15: ...cover 3 Assemble and install the crank assembly 4 Install the Anti Billow Rope system 5 Test the operation of the roll up side 4 Place the assembled conduit at the base of the side where the end of t...

Страница 16: ...cted using wood boards under each rafter foot or if baseboards were installed If the shelter was constructed on concrete footings a concrete slab or on bare ground alternative steps must be taken by t...

Страница 17: ...fore reassembling For replacement or missing parts call 1 800 245 9881 for assistance 4 Attach the remaining eyebolts using the diagram above as a pattern guide 5 Once all eyebolts are installed in th...

Страница 18: ...01 20 QUICK START GUIDE 26 Wide Round Economy High Tunnels 26 0 Width 12 6 15 16 Heigth F FR RO ON NT T Grid Represents 12 Squares Ground Level Diagram shows a different length but similar model Econ...

Страница 19: ...01 26R1602 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 ATTENTION Except fo...

Страница 20: ...Y HIGH TUNNELS Revision date 01 01 20 7 131S075 1 131P0735 48 0 Length Customer Supplied Baseboards Customer Supplied Ribbon Boards Purlin Run 6 0 on center Rafter Spacing center to center SIDE PROFIL...

Страница 21: ...HIGH TUNNELS Revision date 01 01 20 SIDE PROFILE PB01710R6 6 0 on center Rafter Spacing 96 0 Length center to center 15 131S075 1 131P0735 Purlin Run Customer Supplied Baseboards Customer Supplied Ri...

Страница 22: ...View 1 End Rafter Purlin Connection Purlin 102548 Rafter View 2 Mid Rafter Purlin Connection Purlin ATTENTION Install a Tek screw through each clamp into the rafter and through each clamp into the pu...

Страница 23: ...23 GROWSPAN ROUND ECONOMY HIGH TUNNELS Revision date 01 01 20 Space below is reserved for customer notes...

Отзывы: