INSTALL ANTI-BILLOW ROPES (continued)

SHELTER CARE AND MAINTENANCE

Proper care and maintenance of the shelter is important. 

Check the following items periodically to properly maintain 

the shelter:
•  Regularly check the main cover and panels (if 

equipped) to see that these remain tight and in proper 

repair.

•  Check connections and all fasteners to verify that they 

remain tight.

•  Do not climb or stand on the frame at anytime.
•  Remove debris and objects that may accumulate on 

the cover. Use tools that will not damage the cover 

when removing debris.

•  Remove snow to prevent excess accumulation. Use 

tools that will not damage the cover when removing 

snow.

•  Check the contents of the high tunnel to verify that  

nothing is touching the cover or the side panels that 

could cause damage.

•  Check the anchoring system to ensure that all  

components are tight and in good repair.

•  If the shelter is moved, inspect all parts and  

connections before reassembling.

•  For replacement or missing parts, call 1-800-245-9881 

for assistance.

4.  Attach the remaining eyebolts using the diagram above 

as a pattern guide.

5.  Once all eyebolts are installed in the proper locations, 

install the anti-billow rope 

in short lengths along each 

side

. Thread the free end of the rope through the end 

rafter eyebolts and the eyebolts at two to three interior 

rafters. 

6.  Cut the rope and tie one end to the eyebolt. 
7.  Pull the rope tight and tie the remaining end to secure.
8.  Repeat the steps to install another section of anti-billow 

rope. Continue this pattern until all ropes are tied along 

one side and repeat the steps to install the anti-billow 

ropes for the remaining side. 

 

NOTE: 

The number of individual ropes along any one 

side depends on the length of the building and the 

length of the rope sections.

9.  Check the roll-up side operation.
10. Read the shelter care and maintenance information 

that follows.

NOTE:

 If the poly latch U-Channel was attached to 

a ribbon board (as suggested), the eyebolt can be 

mounted through the poly latch channel and ribbon 

board to the inside of the rafter.

ROPE

#1

NOTE:

 The circles identify 

the ends of ROPE #1.

ROPE

#2

Содержание PB01700R6

Страница 1: ...s a different length but similar model Economy high tunnels include film roof and film end panels STK DIMENSIONS PB01700R6 26 W x 12 H x 48 L PB01710R6 26 W x 12 H x 96 L 2020 GrowSpan All Rights Rese...

Страница 2: ...manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and pre...

Страница 3: ...equipped This applies to fabric covers that stretch over the frame assembly Your shelter may include roof panels or side panels or both 11 Read the Care and Maintenance information at the end of thes...

Страница 4: ...ed for buildings with roll up sides Materials for baseboards and ribbon boards are not included and are supplied by customer ATTENTION Fasteners to secure boards to building frame are included Recomme...

Страница 5: ...Screw Tek Screw Rafter The following graphics and photos will help you identify the different parts Some parts are not shown Swaged Plain Swaged and Plain Rafter Sections 102198 U Channel Spring CC62...

Страница 6: ...ly procedure 2 Assemble the rafters and frame and square the frame 3 Prepare and attach end panels 4 Attach main cover and roll up side crank assembly Ground Level End Rafter Inside Rafter Baseboards...

Страница 7: ...ore driving the remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter T...

Страница 8: ...crews so they will not touch the cover once it is installed This is typically on the backside of the rafter which will be the surface visible from the inside of the high tunnel once the frame is assem...

Страница 9: ...the purlin pipe in the joint where the rafter pipes are connected to keep purlins aligned during assembly 7 Repeat the previous step to install a second purlin section See the above diagram for detai...

Страница 10: ...ign with the center of the end rafter for best results If the purlin is too short to fit into the rafter end clamps without pulling the end rafter out of plumb first verify you have the correct pipe I...

Страница 11: ...Continue by installing the remaining pipe and clamps BASEBOARD INSTALLATION RECOMMENDED Gather the parts Treated or recycled plastic lumber supplied by customer Recommended 2 x 6 1 4 x 4 carriage bolt...

Страница 12: ...r supplied wood screws to secure U channel to ribbon board Do not use Tek screws to attach U Channel to wood NO RIBBON BOARD Attach one section of the poly latch U Channel to the side of the frame usi...

Страница 13: ...nd pull the cover into place Center cover side to side and end to end IMPORTANT To prevent damage to the main cover during installation additional personnel and lifts may be needed INSTALL POLY LATCH...

Страница 14: ...h edges of the first end rafter until the entire length of the end of the main cover is secured in place 7 Stretch the cover to the other end of the building and repeat the steps to secure the main co...

Страница 15: ...cover 3 Assemble and install the crank assembly 4 Install the Anti Billow Rope system 5 Test the operation of the roll up side 4 Place the assembled conduit at the base of the side where the end of t...

Страница 16: ...cted using wood boards under each rafter foot or if baseboards were installed If the shelter was constructed on concrete footings a concrete slab or on bare ground alternative steps must be taken by t...

Страница 17: ...fore reassembling For replacement or missing parts call 1 800 245 9881 for assistance 4 Attach the remaining eyebolts using the diagram above as a pattern guide 5 Once all eyebolts are installed in th...

Страница 18: ...01 20 QUICK START GUIDE 26 Wide Round Economy High Tunnels 26 0 Width 12 6 15 16 Heigth F FR RO ON NT T Grid Represents 12 Squares Ground Level Diagram shows a different length but similar model Econ...

Страница 19: ...01 26R1602 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 End Clamp 102856 Mid Clamp 102548 ATTENTION Except fo...

Страница 20: ...Y HIGH TUNNELS Revision date 01 01 20 7 131S075 1 131P0735 48 0 Length Customer Supplied Baseboards Customer Supplied Ribbon Boards Purlin Run 6 0 on center Rafter Spacing center to center SIDE PROFIL...

Страница 21: ...HIGH TUNNELS Revision date 01 01 20 SIDE PROFILE PB01710R6 6 0 on center Rafter Spacing 96 0 Length center to center 15 131S075 1 131P0735 Purlin Run Customer Supplied Baseboards Customer Supplied Ri...

Страница 22: ...View 1 End Rafter Purlin Connection Purlin 102548 Rafter View 2 Mid Rafter Purlin Connection Purlin ATTENTION Install a Tek screw through each clamp into the rafter and through each clamp into the pu...

Страница 23: ...23 GROWSPAN ROUND ECONOMY HIGH TUNNELS Revision date 01 01 20 Space below is reserved for customer notes...

Отзывы: