GrowSpan Gothic Pro 106314R Скачать руководство пользователя страница 51

51

GROWSPAN

 GOTHIC PRO GREENHOUSES AND SYSTEMS

Revision date: 05.29.19

CONNECTION - END W

ALL

 DET

AILS

Содержание Gothic Pro 106314R

Страница 1: ...a different but similar model STK DIMENSIONS 106314R 34 W x 12 H x 40 L 106315R 34 W x 12 H x 48 L 106316R 34 W x 12 H x 72 L 106317R 34 W x 12 H x 96 L 2019 Growers Supply All Rights Reserved Reprod...

Страница 2: ...er location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never...

Страница 3: ...Install main roof panels 13 Read the care and maintenance information in next column POLYCARBONATE PANELS Do not allow panels to remain in direct sunlight with protective film in place Doing so will c...

Страница 4: ...g or you have questions consult the Pictorial Parts Guide and all diagrams for clarification or contact Customer Service NOTE At this time you do not need to open the plastic bags containing smaller p...

Страница 5: ...age Bolt Hex Nut 104624 Square Tube Fitting QH1330 Angle Bracket 104213 Aluminum U Channel Profile 104548 End Cap Profile Doors Fans Vents 102570 Aluminum Channel Aluminum 8 H Channel Profile 102717 G...

Страница 6: ...l does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 7: ...alling the end clamps cross connectors and purlins Purlins Ground Post Chord GrowSpan Gothic Pro Greenhouses and Systems OVERVIEW See illustration below to identify main parts of greenhouse 1 Locate r...

Страница 8: ...round post 6 Repeat the same step for the last corner post NOTE The distance measured diagonally between corner posts must be equal for the building to be square 7 Check all dimensions and adjust if n...

Страница 9: ...the two 2 end rafters are set onto the ground posts 1 Select the seven 7 pipes needed to assemble the first end rafter and arrange on a level surface 2 Slide six 6 end purlin clamps three on each side...

Страница 10: ...pipe joint is properly seated NOTE These pipes must be separated during the assembly procedure Do not fasten them together at this time 3 For the 48 rafter spacing measure forty eight and three quart...

Страница 11: ...Cross connector 102548 5 16 x 2 1 2 Machine bolts and 5 16 nuts Lifts ladders and assistants Rope or cable 1 Carefully stand the first end rafter slide a band clamp onto each rafter leg and place the...

Страница 12: ...align the mark on the purlin with the center of the rafter to maintain the proper spacing Interior Rafter Align mark with center of rafter Purlin 11 Verify that the rafter spacing is forty eight inche...

Страница 13: ...ded Minimum size is 2 x 6 Length determined by building length Materials for baseboards are supplied by the customer Fasteners to secure baseboards to frame are included with building A baseboard 2 x...

Страница 14: ...ponsible for providing a baseboard for this frame If no baseboard is present attach the strut to the ground post using a Tek screw or other customer supplied fasteners 4 Repeat the above steps to atta...

Страница 15: ...eciding where to install the additional horizontal framing for accessories Consult the diagrams in the Quick Start section showing the polycarbonate panel locations and the locations of the aluminum t...

Страница 16: ...quare tube 102897 insert the swaged end of the long tube into the plain end of another tube and tap with a hammer to properly seat the tubes at the joint 11 On this assembled frame member mark the len...

Страница 17: ...e is plumb and tighten the band clamp bolt to lock the first door frame member in place 18 Choose the square tube for the door frame header and cut the swaged end to the proper length for the width of...

Страница 18: ...longer tube One 1 square tube fitting 104624 to attach the support to the base tube of the end wall assembly One 1 square to round tube connect bracket 104074 to attach the tubing to the band clamp on...

Страница 19: ...when the optional double door is not used Consult the end frame diagram for additional information 1 Read the note regarding the installation of optional accessories at the beginning of the end wall...

Страница 20: ...te vent tape Consult the polycarbonate panels Quick Start section for the location and lengths of each panel The diagrams are located at the back of these instructions ATTENTION Panels must be positio...

Страница 21: ...es of the panels shown in the diagram below Frame shown above may differ from actual frame 5 Continue with the Double Door Assembly procedures that follow END PANEL INSTALLATION continued The greenhou...

Страница 22: ...inum U Channel profile Corners are cut at 45 angles To keep the panel and profile in place the long Tek screws and neo bonded galvanized washers are installed so the screw drills through the longer ed...

Страница 23: ...to the rough opening to stop the door in the frame and to help seal the gap between the door and frame End cap used for door stop and seal Diagram may show a different frame used for illustration purp...

Страница 24: ...er panel by six 6 inches 4 Install ridge cap 5 Repeating Steps 1 3 work toward other end of frame until all panels and ridge cap sections are installed 6 Attach aluminum profile to lower edge of upper...

Страница 25: ...panel Required distance from finished grade to bottom of roof panels is 42 1 Measure and mark the height of roll up side panel at 42 on the end rafter at one end of the greenhouse 2 Move to opposite...

Страница 26: ...side and remove protective film NOTE Mark UV protected side using a piece of tape or other means to ensure side is installed toward the sun 2 Apply vent tape 104774 to cover one end of panel 3 Move t...

Страница 27: ...ews at least 6 up from lower edge of panel to allow for installation of ribbon board in a latter procedure See diagram install screws between dashed lines Duct tape can be used in small pieces to hold...

Страница 28: ...from top Review diagrams below for another way to install lower panels a After installing lower panels of first frame bay prepare the next lower panel as previously described but do not attach any H...

Страница 29: ...viously described using FA4484B Tek screws and 102921 washers ATTENTION Install upper Tek screws approximately 7 inches down from end of panel to allow for a 6 overlap of next panel 18 Repeat Steps 11...

Страница 30: ...set panel on frame and overlap top of lower mid panel by 6 23 Align panel and center H channel with center of end rafter and first interior rafter 24 Secure panel to rafters as previously described us...

Страница 31: ...ach ridge cap to 104548 end cap using FA4484B Tek screws and 102921 neo bonded washers Repeat to secure remaining side of ridge cap 104548 end cap cut to fit between rafters inside frame Tek screw and...

Страница 32: ...Solid line shows lower end of all upper panels dashed line shows upper edge of all lower panels which is capped with foil tape during panel preparation IMPORTANT BEFORE INSTALLING NEXT SET OF UPPER PA...

Страница 33: ...where to measure to determine length of 1 5 x 1 5 tube Diagram shows installed panels as seen standing inside greenhouse 4 From inside the frame align square tube as shown over lower end of upper pane...

Страница 34: ...wn Inside Greenhouse Outside Greenhouse 104213 U Channel Mid Panel 104779 Backer Tube inside greenhouse Upper Panel FA4484B Tek Screw 102921 Neo Bonded Washer FRAME CHECK Before you attach the roll up...

Страница 35: ...d properly the U Channel is aligned with the bottom of each polycarbonate panel Gather the parts Aluminum U Channel profile 104213 Double poly latch U Channel 104211 Tek screws FA4482B 6 Return to eac...

Страница 36: ...the roll up side cover material This assembly runs the length of the frame and serves as the center pipe that the roll up cover wraps around when it is opened to ventilate the shelter This conduit is...

Страница 37: ...clips evenly spaced along the conduit 4 Continue to roll the conduit until the excess cover material is wound around the conduit 5 Repeat these steps for the other side of the shelter 6 With the exce...

Страница 38: ...ct the bearing bracket and attach the bearings as needed In some instances the bearings may come already attached Assemble as follows NOTE Single bearings are attached to the sides of the bracket and...

Страница 39: ...tach the rolled conduit to the square shaft of the assembly by inserting a carriage bolt through the hole in the conduit and tubing adapter Tighten the nut 16 Attach the crank handle to the Twist of t...

Страница 40: ...l upper edge of both end walls with a bead of sealant See dashed line in diagram below Frame shown may differ from actual frame 6 Seal joint where ridge cap and panel meet if this was not done during...

Страница 41: ...ate on greenhouse Use tools that will not damage panels cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage polycarbonate panels when removing snow Che...

Страница 42: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 42 Revision date 05 29 19 QUICK START GUIDE 34 Gothic Pro Greenhouse Frame shown may differ in length from actual frame...

Страница 43: ...ipe Pipe IMPORTANT If rafter support kits were purchased for all or some of the interior rafters do not install the 116P120 chord pipe at the peak These are not used when support kits are installed Re...

Страница 44: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 44 Revision date 05 29 19 SIDE PROFILE 106314R Ground Level...

Страница 45: ...45 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 05 29 19 SIDE PROFILE 106315R Ground Level...

Страница 46: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 46 Revision date 05 29 19 SIDE PROFILE 106316R Ground Level...

Страница 47: ...47 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 05 29 19 SIDE PROFILE 106317R Ground Level...

Страница 48: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 48 Revision date 05 29 19 CONNECTIONS...

Страница 49: ...49 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 05 29 19 CONNECTION FRAME DETAILS...

Страница 50: ...C L 48 C L C L 25 1 8 C L C L 48 C L C L 48 C L C L VIEW 1 VIEW 3 VIEW 2 NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING TUBES ARE FULL...

Страница 51: ...51 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 05 29 19 CONNECTION END WALL DETAILS...

Страница 52: ...C L 47 15 16 C L C L 25 1 8 C L C L 22 7 8 C L C L 48 C L C L 48 C L C L 48 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING TU...

Страница 53: ...l does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 54: ...EW EXCESS TRIMMED AND USED HERE EXCESS TRIMMED AND USED HERE 4 X 8 POLY 4 X 8 POLY ONE HALF 4 X 8 POLY ONE HALF 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 10 POLY 4 X 10 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POL...

Страница 55: ...NATE PANELS BACK VIEW EXCESS TRIMMED AND USED HERE 4 X 8 POLY 4 X 10 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 10 POLY EXCESS TRIMMED...

Страница 56: ...MS 56 Revision date 05 29 19 MAIN COVER DETAILS R a f t e r H C h a n n e l P o l y c a r b P o l y c a r b 1 0 4 2 1 3 104213 4 6 Overlap 104213 4 6 Overlap Lower Mid Panels 116049 47 1 4 x 96 Full U...

Страница 57: ...57 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 05 29 19 Space below is reserved for customer notes...

Отзывы: