background image

18 

 

FRONT ASSEMBLY 

1.  Slide the glazing rubber into the channels of the glazing bars before assembly. 

2.  Assemble the frame in exactly the same way as the rear assembly, up to and including stage 5.  

In stage 3 the rear purlins are changed for front purlins which are shorter [636mm] (Diagram I) 

3.  Insert rubber into both front glazing bars on the outside edge only (this is because the inside 

edge will not be glazed as the door is fitted here), however you do need to fit about 120mm of 

rubber to the top inside edge to enable you to install the pane of glass above the door.  Now 

attach the glazing bars to the cill by slotting a 15mm bolt into the bolt channel of the glazing 

bars and locating it with the punched holes in the cill. Before securing the nuts attach the diago-

nal bracings to the same bolts (Diagram O). 

4.  Now slide two 15mm bolts down each front glazing bar followed by five 10mm bolts.  Use the  

top 10mm bolt to attach the front glazing bars to roof corner bars. 

5.  Attach  the  main  door  track  support  (406)  to  the  two  glazing  bars  using  the  door  track     

support  brackets  (Diagram  M).    Use  three  of  the  10mm  bolts  to  fix  the  door  track  support 
bracket to the glazing bars, leaving the last 10mm bolt below the bracket to attach the two top 
front purlins. 

6.  Take the short length of glazing bar (448) and slide a 10mm bolt into each end. Line these bolts 

up with the holes in the main door track support and the ridge plate and attach the nuts. 

7.  You now need to attach the lower front purlin on the top of the two 15mm bolts, attaching the 

other end to the side corner bar.  The hole in the centre of the purlin should line up with the 
hole in the flat diagonal bracing.  Bolt them together using 10mm bolts (The head of the bolt 
should  face  outwards  with  the  shank  facing  inwards.  This  is  to  prevent  possible  damage  to 
glass).  Repeat this on the opposite side (Marked ‘@

¹

’).  (The door stops will be inserted later in 

the door installation). 

8.  Bolt the door track to the main door track support (Diagram L) by inserting 3 bolts into the bolt 

slot of the door track. Position these through the 3 holes in the main door track support above 
the door opening. When this has been achieved tighten all nuts.  The height of the track will 
have to be adjusted when fitting the door. 

9.  Slide  another  10mm  bolt  into  each  end  of  the  door  track  and  attach  the  vertical  door  track    

supports (508).  Bolt the other ends of the brackets to the roof corner bar (416) using a base 
bracket (300) (Diagram K). 

Part Name 

Part  

Length 

Qty  

No. 

mm 

Required 

  

Base bracket 

300 

Bracing, front purling - 8' W 

309 

638 

Bracing, flat 

315 

1,779 

Cill, front & rear 8' W 

334 

2,508 

Door runner - 2508mm 

375 

2,508 

Door stop 

400 

40 

Door track - 2508mm  

403 

2,508 

Door track support bracket 

404 

Door track, main support - 1232mm 

406 

1,232 

Glazing bar, corner, roof left - 8' W 

410 

1,501 

Glazing bar, corner, roof right - 8' W 

416 

1,501 

Glazing bar, corner, side 

430 

1,670 

Glazing bar, front & rear - 8' W 

438 

2,075 

Glazing bar, above door - 8' W 

448 

524 

Ridge plate 

500 

Support, door track vertical - 8' W 

508 

258 

Threshold - 1206mm 

526 

1,206 

Bolt, square head - 10mm M6 

576 

10 

41 

Nut - M6 

579 

51 

Nut caps 

580 

51 

Bolt, square head - 15mm M6 

588 

15 

10 

Содержание HE-BLE

Страница 1: ...8 Wide ASSEMBLY INSTRUCTIONS ISSUE 4 Model HE BLE...

Страница 2: ...on This instruction manual is also available online at www greenhousepeople co uk in our technical help section where you can zoom in on all the pictures and text and reprint a copy if your manual ge...

Страница 3: ...ASSEMBLY 22 23 DOOR ASSEMBLY 24 29 ROOF VENT ASSEMBLY 26 29 MAIN BUILDING ASSEMBLY 30 31 LOUVRE ASSEMBLY 32 GLASS PLAN 33 GLAZING 34 39 FINAL FIXING NOTE ALL DIAGRAMS ARE CODED IF THE DIAGRAM IS VIEWE...

Страница 4: ...cket 300 Cill Side 350 351 352 353 354 Door Middle 373 Cill Front Rear 333 Door Stop 400 Door Track 403 Door Stiles female 377 379 Door Track Main Support 406 Glazing Bar Roof Corner Left 410 Glazing...

Страница 5: ...447 Gutter 461 462 463 464 Ridge Plate 500 Ridge 481 482 483 484 Vent Slam Bar 542 Vent Top 543 Edging Strip 558 Plastic Vent Side 541 Glass Jack 557 Plastic Glazing Separator 559 Plastic Glazing Bar...

Страница 6: ...p 577 Nut M4 578 Nut M6 579 Bolt Square Head M6 15mm 588 Screw Countersunk M4 10mm 587 Door Stop Bung 560 Rubber Cantilever Ridge 600 Cantilever Eaves 601 Screw Self Tapping M4 2 19mm 583 Hanging Bask...

Страница 7: ...4 3454 4 13 4 4064 1 6 457 2 3 5 1041 4 5 5 1651 7 5 2260 6 9 5 2870 2 11 5 3479 8 13 5 4089 4 1 7 482 6 3 6 1066 8 5 6 1676 4 7 6 2286 9 6 2895 6 11 6 3505 2 13 6 4114 8 1 8 508 3 7 1092 2 5 7 1701...

Страница 8: ...the concrete is not sealed painted or laid on a membrane Ways of increasing drainage are When laying the concrete you could lay Aco drive drains to take surface water away or if the concrete is alread...

Страница 9: ...ead across for the width and length The dimensions allow the lips of the cills to overhang This helps prevent water running back into the greenhouse When building your base make sure the diagonal meas...

Страница 10: ...e a much neater finish Simply use a float to smooth the edges Use a watering can to dampen the slabs at the end to remove any cement dust and to dampen the sand and cement below the slabs slightly We...

Страница 11: ...erable locations such as under trees in playing areas etc x Be aware of the increased temperature in a greenhouse on a sunny day x Do not keep pets or other animals in a greenhouse x When cleaning gla...

Страница 12: ...thawing process of the earth Organising your components x On opening your main greenhouse box DO NOT UNWRAP any of the labelled bundles until they are required Be CAREFUL not to mix up any of the bun...

Страница 13: ...bracings on the same bolts so they point outward towards the ends of the gutter and lightly tighten the nuts Diagram C Page 15 6 On buildings larger than 6 long you will need to attach additional gla...

Страница 14: ...14 SIDE ASSEMBLY 447 447 303 354 462 463 464 303 353 352 351 461 461 351 6 LONG 8 LONG 10 LONG 12 LONG 6 LONG EXAMPLE A B C D...

Страница 15: ...15 SIDE ASSEMBLY 303 461 461 447 447 447 303 351 588 A B D C 576 576 300 576...

Страница 16: ...plate and into the holes punched in the flange of the roof corner bar at the apex Diagram F 6 Attach the rear cill to the side corner bars by using one of the 15mm bolts inserted in step 3 Loosen the...

Страница 17: ...17 REAR ASSEMBLY E F G H 430 430 315 315 438 438 318 334 416 410 410 416 500 318 416 430 588 576 576 430 334 588 334 438 588 318 576 300 300 449...

Страница 18: ...purlin on the top of the two 15mm bolts attaching the other end to the side corner bar The hole in the centre of the purlin should line up with the hole in the flat diagonal bracing Bolt them together...

Страница 19: ...19 FRONT ASSEMBLY 410 416 500 576 309 416 430 588 576 I J N O K L M P 430 430 309 309 309 309 416 410 334 526 315 315 438 438 406 403 448...

Страница 20: ...20 FRONT ASSEMBLY 416 403 508 576 K M L 403 403 403 576 576 576 406 406 406 404 437 300 406 403...

Страница 21: ...21 N O P FRONT ASSEMBLY 437 588 334 334 526 375 526 300 315 588 334 300 576 430...

Страница 22: ...n of the door you can bolt the door handle onto the left hand door stile The bolts should be inserted from the outside with the nuts on the inside 7 You can now build the left hand door 8 This is cons...

Страница 23: ...23 DOOR ASSEMBLY 379 379 379 571 707 379 571 583 373 373 708 708 571 583 583 S T U 563 X 880 384 563 X 880 563 X 880 563 X 880 373 707 707 377 708 379 381...

Страница 24: ...t Attach the casement stay to the vent bottom using the M4 countersunk screws and nuts 2 Lay the components out so the underside of the vent is facing up Lightly bolt the vent sides to the vent top Di...

Страница 25: ...he vent side This is a view of the underside of the vent top Looking down onto the vent bottom from outside X Looking at the vent bottom from the outside This is a view of the underside of the vent bo...

Страница 26: ...e into the small gap between the roof corners so that the 2 flanges which form the angle of the roof are tight up against the inside edge of the roof corner bars The vertical part of the ridge is outs...

Страница 27: ...ne of keeping the roof bar tight up to the ridge could result in a slight outward bow of the gutters and a slight downward dip to the ridge Also try to make sure that no glazing rubber extends from th...

Страница 28: ...28 MAIN BUILDING ASSEMBLY EE FF HH GG DD 430 351 334 576 481 416 410 461 444 447 444 444 481 461 444 447 600 601 576 300 588 CC 461 416 430 315 318...

Страница 29: ...our starting point for the cresting You will see that the cresting is moulded so that it all links together making the assembly much stronger Diagram JJ The first section of cresting you should use is...

Страница 30: ...When you are fitting your louvre the pane of glass 610 X 457 must be inserted below it first 4 Use your four crop headed bolts to attach the louvre to your side glazing bars Diagram Z You will NOT nee...

Страница 31: ...Self tapping screws 10mm M4 Top cill Side bar Self tapping screws 10mm M4 Side bar Top cill 573 X 100 Pinch before inserting glass Top cill Side bar Use this slot to attach the louvre to the greenhous...

Страница 32: ...12 14 16 Q 610 X 1520 5 6 7 8 R 610 X 917 1 2 3 4 V 610 X 759 1 2 2 2 DD 563 X 880 4 4 4 4 EE 610 X 412 X 10 4 4 4 4 CC 610 X 511 X 110 2 2 2 2 FF 610 X 819 X 417 2 2 2 2 Glass Jack 557 590 X 33 2 2...

Страница 33: ...wards and forwards while you are up your supported ladders you will be able to alter the vertical aspect of your structure you can also place a spirit level against the gables and the sides to assess...

Страница 34: ...ot it onto the bolts inserted in the roof glazing bars during the main building assembly loosely fit the nuts Now slide the slam bar onto the top of the pane of glass below where the vent is going and...

Страница 35: ...height of the door track you do this by loosening the bolts that join the door track support bracket to the front glazing bars 2 With the door half open you can now add the door stop Diagram QQ SS Be...

Страница 36: ...36 FINAL FIXING 400 437 309 DOOR INSTALLATION QQ SS 377 438 438 315 315 526 707 373 437 309 400 RR 588 588 309 309 707 377 381 560 560...

Страница 37: ...oosely attaching nuts and work along to the other end If you are using an autovent you may need to adjust the position of the bars to allow the autovent to work freely 3 The easiest way to ensure the...

Страница 38: ...sert the downpipe into the outlet 4 When you are happy with its position line up the bracket with the side corner bar mark through the screw hole and with a 3 2mm drill make a pilot hole Using the sel...

Страница 39: ...the building 3 Make sure the greenhouse structure is square Diagonal measurements should be equal and level 4 Drill down through the holes in the base brackets into the concrete 5 Insert a wall plug...

Страница 40: ...reenhousepeople co uk E mail info thegreenhousepeople co uk The Greenhouse People Ltd Blythe Business Park Cresswell Stoke on Trent Staffordshire ST11 9RD Tel 01782 388811 Fax 01782 388818 info greenh...

Отзывы: