39
FINAL FIXING
ANCHORING BUILDING
TO SLAB / CONCRETE
BASE
FIX HERE
1.
For this final stage you will need eight No.10 X 2” screws,
eight brown wall plugs, a 7mm masonry drill bit and a
hammer drill.
2.
Fixing the greenhouse to the ground is very simple to do.
When you built the front, rear and side assemblies you will
have attached base brackets (Part number: 300) in specific
places around the building.
3.
Make sure the greenhouse structure is square (Diagonal
measurements should be equal) and level.
4.
Drill down through the holes in the base brackets into the
concrete.
5.
Insert a wall plug into each hole.
6.
Finally drive a screw into each hole.
7.
You should now go round the entire greenhouse, inside and
out, pushing on the nut caps.
8.
The last job is to insert the Ridge caps (582), these simply
push on to the ridge. You can now check the greenhouse
and look for any gaps where water might come in, fill these
using the silicone supplied.
9.
Your greenhouse is now complete.
582
Содержание HE-BLE
Страница 1: ...8 Wide ASSEMBLY INSTRUCTIONS ISSUE 4 Model HE BLE...
Страница 15: ...15 SIDE ASSEMBLY 303 461 461 447 447 447 303 351 588 A B D C 576 576 300 576...
Страница 20: ...20 FRONT ASSEMBLY 416 403 508 576 K M L 403 403 403 576 576 576 406 406 406 404 437 300 406 403...
Страница 21: ...21 N O P FRONT ASSEMBLY 437 588 334 334 526 375 526 300 315 588 334 300 576 430...