38
FINAL FIXING
DOWNPIPE INSTALLATION
UU
VV
1.
Firstly you need to decide whether you want the water in your gutters to drain to the front or
the rear of the greenhouse.
2.
The gutter outlets and stop ends simply push into the gutters (Diagram UU & VV). For an
even better seal you could run a bead of silicone around the inside edge of the gutter before
inserting the outlet and stop end.
3.
Now take the downpipe and slide on the bracket. Insert the downpipe into the outlet.
4.
When you are happy with its position line up the bracket with the side corner bar, mark
through the screw hole and with a 3.2mm drill make a pilot hole. Using the self tapping screw
fix the bracket to the corner bar (Diagram WW).
5.
Finally push the 45 degree pipe (593) onto the end of the downpipe to direct the flow of water.
6.
Repeat on the opposite corner.
462
591
590
462
430
430
WW
590
592
594
430
Part Name
Part
Length
Qty
No.
mm
Required
Screws, self tapping - 19mm M3.5
583
19
2
Gutter outlet
590
70
2
Gutter stop end
591
26
2
Downpipe
592
1500
2
45 degree double collar
593
-
2
Downpipe bracket
594
-
2
Содержание HE-BLE
Страница 1: ...8 Wide ASSEMBLY INSTRUCTIONS ISSUE 4 Model HE BLE...
Страница 15: ...15 SIDE ASSEMBLY 303 461 461 447 447 447 303 351 588 A B D C 576 576 300 576...
Страница 20: ...20 FRONT ASSEMBLY 416 403 508 576 K M L 403 403 403 576 576 576 406 406 406 404 437 300 406 403...
Страница 21: ...21 N O P FRONT ASSEMBLY 437 588 334 334 526 375 526 300 315 588 334 300 576 430...