GreenAire RAH-SAU series Скачать руководство пользователя страница 6

call the Factory. Also make sure that the Cooling Cycle/Coil is off and
not operating when the humidifier is on. Remember
will be running in the winter time/heating season so in most cases the
cooling coil
are year around cooling loads
taken to turn off the cooling coil or control it differently than normal
when integrating a humidifier into the System.

9.

Take the wet switch safety and place it temporarily off the floor of the
Panel or STS Box. There should be enough of a tether on the wire
harness to allow you to hang it outside the panel/STS box or to hang it
at a higher position temporarily. Some models no
thick small section of plexiglass as a permanent resting plate for the
wet switch. If this is present then none of the above is required and
the Wet Switch can remain in it’s normal position.

10. now turn the CB into the ‘on’ position.
11. now turn on the panel door on/off switch. It is a lighted switch so it

should light up when in the ‘on’ position.

12. with the panel turned on, if there is a controller provided with the

system it should become active and show figures on it’s display. The
figures should correspond to both the actual humidity level and the
target set point humidity level. Make sure their respective readings
make sense and seem accurate for the time of year you are
conducting this start up.
Controller go to the section in this Manual titled Controller.

13. Assuming you have relevant readings on the controller raise the Set

Point humidity level to above what the actual humidity level is reading.
This is especially important when starting up the Syst
warmer or summer time conditions. For example
reading 58%Rh in the target space and your humidity winter
time/heating season target is 35%Rh then the Controller will not
energize the System to produce fog because the actua
humidity is 23 points above target. In this scenario you must adjust the
set point to an artificially high set point in order for the controller to
energize system.

14. Once the controller is in a ‘call for humidification’ mode and the target

humidity set point is higher than the actual humidity level then the
system should begin preparing to humidify.

15. Verify that water has begun to flow into the UPC tank. You should

have heard the solenoid valves energize. You can also check by
opening up t
model type.

16. Verify that the Wet Switch is showing a ‘green’ lite.
17. Verify that there are no leaks in the tubing within the Panel or STS box

as the water fills. (tubing may have gotten loosened
installation
Factory)

call the Factory. Also make sure that the Cooling Cycle/Coil is off and
not operating when the humidifier is on. Remember –
will be running in the winter time/heating season so in most cases the
cooling coil would not be on. For some applications and facilities there
are year around cooling loads – if this is the case then care must be
taken to turn off the cooling coil or control it differently than normal
when integrating a humidifier into the System.

the wet switch safety and place it temporarily off the floor of the

Panel or STS Box. There should be enough of a tether on the wire
harness to allow you to hang it outside the panel/STS box or to hang it
at a higher position temporarily. Some models now come with a ¼”
thick small section of plexiglass as a permanent resting plate for the
wet switch. If this is present then none of the above is required and
the Wet Switch can remain in it’s normal position.
now turn the CB into the ‘on’ position.

rn on the panel door on/off switch. It is a lighted switch so it

should light up when in the ‘on’ position.
with the panel turned on, if there is a controller provided with the
system it should become active and show figures on it’s display. The

should correspond to both the actual humidity level and the

target set point humidity level. Make sure their respective readings
make sense and seem accurate for the time of year you are
conducting this start up.For more details and specifics on the

oller go to the section in this Manual titled Controller.

Assuming you have relevant readings on the controller raise the Set
Point humidity level to above what the actual humidity level is reading.
This is especially important when starting up the System during
warmer or summer time conditions. For example – if the controller is
reading 58%Rh in the target space and your humidity winter
time/heating season target is 35%Rh then the Controller will not
energize the System to produce fog because the actua
humidity is 23 points above target. In this scenario you must adjust the
set point to an artificially high set point in order for the controller to
energize system.
Once the controller is in a ‘call for humidification’ mode and the target
humidity set point is higher than the actual humidity level then the
system should begin preparing to humidify.
Verify that water has begun to flow into the UPC tank. You should
have heard the solenoid valves energize. You can also check by
opening up the top latches of the UPC tank if it is a side inlet and outlet
model type.
Verify that the Wet Switch is showing a ‘green’ lite.
Verify that there are no leaks in the tubing within the Panel or STS box
as the water fills. (tubing may have gotten loosened during shipping or
installation – all Systems are live tested before they ship from the

6

call the Factory. Also make sure that the Cooling Cycle/Coil is off and

the humidifier

will be running in the winter time/heating season so in most cases the

would not be on. For some applications and facilities there

if this is the case then care must be

taken to turn off the cooling coil or control it differently than normal

the wet switch safety and place it temporarily off the floor of the

Panel or STS Box. There should be enough of a tether on the wire
harness to allow you to hang it outside the panel/STS box or to hang it

w come with a ¼”

thick small section of plexiglass as a permanent resting plate for the
wet switch. If this is present then none of the above is required and

rn on the panel door on/off switch. It is a lighted switch so it

with the panel turned on, if there is a controller provided with the
system it should become active and show figures on it’s display. The

should correspond to both the actual humidity level and the

target set point humidity level. Make sure their respective readings
make sense and seem accurate for the time of year you are

For more details and specifics on the

oller go to the section in this Manual titled Controller.

Assuming you have relevant readings on the controller raise the Set
Point humidity level to above what the actual humidity level is reading.

em during

if the controller is

reading 58%Rh in the target space and your humidity winter
time/heating season target is 35%Rh then the Controller will not
energize the System to produce fog because the actual space relative
humidity is 23 points above target. In this scenario you must adjust the
set point to an artificially high set point in order for the controller to

Once the controller is in a ‘call for humidification’ mode and the target
humidity set point is higher than the actual humidity level then the

Verify that water has begun to flow into the UPC tank. You should
have heard the solenoid valves energize. You can also check by

he top latches of the UPC tank if it is a side inlet and outlet

Verify that there are no leaks in the tubing within the Panel or STS box

during shipping or

all Systems are live tested before they ship from the

Содержание RAH-SAU series

Страница 1: ...INSTALLATION AND OPERATION FOR VS 7 14 INSTALLATION AND OPERATION FOR RAH SAU Series 1 INSTALLATION AND OPERATION...

Страница 2: ...eference of the End User or Installer The following rules should be followed Place the Control Panel in a place where the outlet fog will not impinge on any surfaces Make sure to verify the air patter...

Страница 3: ...vide humidifiers Utilize a t connector provided and taped to the RO system metal frame to hook up the product water blue line to the storage tank Locate the 2 5 gallon storage bladder proximity to the...

Страница 4: ...Generator panel at the appropriately labeled locations on the terminals Refer to the Wiring Diagram provided with your unit for proper landing locations and line sizes Shielded control wire is recomme...

Страница 5: ...ed to a drain Turning the System On go to the control panel and make sure the panel on off switch is off open up the control panel and make sure the circuit breaker CB is off if CB is showing green th...

Страница 6: ...ith the system it should become active and show figures on it s display The should correspond to both the actual humidity level and the target set point humidity level Make sure their respective readi...

Страница 7: ...turned off and verify that the Humidifier turns off as well as air flow stops b With the AC System back on if possible locate the HiLimit switch and lower its setting to as low as it can go The switc...

Страница 8: ...xcessive continuous run time when humidifier is undersized or the space really needs more humidifiers but the customer elected not to furnish and install them If your model has a timer delay relay go...

Страница 9: ...ure that the comes on Verify that the air flow switch has closed after properly sensing that air is moving in the duct Verify that the HiLimit switch circuit is closed Check the Wet Switch and verify...

Страница 10: ...on when there is a call for humidification and not just when there is a call for heat There is a dry contact relay in the panel for exactly this purpose Contact the Installer to verify that he utilize...

Страница 11: ...g sure all the UPC discs that should be running are indeed doing so You may do this by observing the operation with a flash light and peering through the plastic lid or taking the lid off see above in...

Страница 12: ...12...

Страница 13: ...13...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...16...

Страница 17: ...17...

Страница 18: ...18...

Страница 19: ...19...

Страница 20: ...120V 1PH Power On R 96 VA 7 6 UPC TANK 3 2 WET SWITCH 9 40 VA 10 WIRING FOR RAH SAU LAB UNIT WITH VECTOR CONTROLLER G Fog On Fill SV 2 11 A 17B Low Water CR3 NC WET SWITCH R WS 12B CR3 CR4 FLOAT SWITC...

Страница 21: ...Idec Single Pole Relay 6048 Idec Single Pole Socket 6050 EMI RFI Fan Guard PARTS LIST Item Description 2 4 MHz Nebulizer Board Model 579R3 304SS with welds stand brackets top flange w PEMS and bottom...

Страница 22: ...y or Factory Representative for current pricing Fan Guard for 4 69 Fan Bulkhead Conn 1 4T x 1 8MPT Brass Part B 400 11 2 clear w paper back in square ft units 10 Amp fuse 12 32 dia time delay 250 VAC...

Отзывы: