IV) Start Up Procedure:

A. Verify Piping connections
1.

double check the inlet and outlet water connections to the system
either at the generator panel or at the S
be tight.

2.

open up any shut off valves up stream to the water inlet and make sure
that, with the water charged, there are no leaks while the System is off.

3.

now check the fogging inlet and outlet connections from the UPC t
(these are typically 3” or 2” connections). Make sure that the hose
couplings are tightened.

4.

evaluate the installing contractor’s piping from the fogging outlet
connection to the DTA and make sure it isn’t excessively long (in
excess of 10’) and
where condensate can accumulate without a drain. (please note
typical steam piping practices should be utilized when piping a fogging
supply line; i.e. don’t create traps and do use the manufacturers
recommended pipe size)

5.

if a vertical header DTA was used make sure the drain connection at
the bottom of the header has been connected to a drain.

B. Turning the System On:

1.

go to the control panel and make sure the panel on/off switch is off.

2.

open up the
– if CB is showing green then the CB is in the ‘off’ position. If it is
showing ‘red’ it is in the ‘on’ position and power will pass through the
CB.

3.

now remove the fuse on the 48VAC transformer a
place it nearby.

4.

verify that the 120V line to the panel is connected and live.

5.

verify that the Air Flow switch is installed and wired appropriately to the
proper terminals in the control panel (see wiring diagram that came
with the pan

6.

verify that the Hi
the proper terminals in the control panel (see wiring diagram that came
with the panel and/or was submitted for that job)

7.

verify that the controll
been installed and has been wired back to the proper terminals in the
control panel (see wiring diagram that came with the panel and/or was
submitted for that job)

8.

verify that the AC System to which the humidifi
and running. Make sure it is running at the expected speed and
volume as scheduled in the Submittals and on the Humidifier
Schedule. If the volume (CFM) is more than 20% different than what
was planned for during the design and s

Start Up Procedure:

Verify Piping connections:

double check the inlet and outlet water connections to the system
either at the generator panel or at the STS box. Connections should

open up any shut off valves up stream to the water inlet and make sure
that, with the water charged, there are no leaks while the System is off.
now check the fogging inlet and outlet connections from the UPC t
(these are typically 3” or 2” connections). Make sure that the hose
couplings are tightened.
evaluate the installing contractor’s piping from the fogging outlet
connection to the DTA and make sure it isn’t excessively long (in
excess of 10’) and that no ‘traps’ have been created in the piping
where condensate can accumulate without a drain. (please note
typical steam piping practices should be utilized when piping a fogging
supply line; i.e. don’t create traps and do use the manufacturers

mmended pipe size)

if a vertical header DTA was used make sure the drain connection at
the bottom of the header has been connected to a drain.

Turning the System On:

go to the control panel and make sure the panel on/off switch is off.
open up the control panel and make sure the circuit breaker (CB) is off

if CB is showing green then the CB is in the ‘off’ position. If it is

showing ‘red’ it is in the ‘on’ position and power will pass through the

now remove the fuse on the 48VAC transformer and hold on to it or
place it nearby.
verify that the 120V line to the panel is connected and live.
verify that the Air Flow switch is installed and wired appropriately to the
proper terminals in the control panel (see wiring diagram that came
with the panel and/or was submitted for that job)
verify that the Hi-Limit switch is installed and has been wired back to
the proper terminals in the control panel (see wiring diagram that came
with the panel and/or was submitted for that job)
verify that the controlling humidity sensor (if supplied by GAS) has
been installed and has been wired back to the proper terminals in the
control panel (see wiring diagram that came with the panel and/or was
submitted for that job)
verify that the AC System to which the humidifier is connected to is on
and running. Make sure it is running at the expected speed and
volume as scheduled in the Submittals and on the Humidifier
Schedule. If the volume (CFM) is more than 20% different than what
was planned for during the design and sizing of the humidifier please

5

double check the inlet and outlet water connections to the system –

TS box. Connections should

open up any shut off valves up stream to the water inlet and make sure
that, with the water charged, there are no leaks while the System is off.
now check the fogging inlet and outlet connections from the UPC tank
(these are typically 3” or 2” connections). Make sure that the hose

evaluate the installing contractor’s piping from the fogging outlet
connection to the DTA and make sure it isn’t excessively long (in

that no ‘traps’ have been created in the piping

where condensate can accumulate without a drain. (please note –
typical steam piping practices should be utilized when piping a fogging
supply line; i.e. don’t create traps and do use the manufacturers

if a vertical header DTA was used make sure the drain connection at
the bottom of the header has been connected to a drain.

go to the control panel and make sure the panel on/off switch is off.

control panel and make sure the circuit breaker (CB) is off

if CB is showing green then the CB is in the ‘off’ position. If it is

showing ‘red’ it is in the ‘on’ position and power will pass through the

nd hold on to it or

verify that the 120V line to the panel is connected and live.
verify that the Air Flow switch is installed and wired appropriately to the
proper terminals in the control panel (see wiring diagram that came

Limit switch is installed and has been wired back to

the proper terminals in the control panel (see wiring diagram that came

ing humidity sensor (if supplied by GAS) has

been installed and has been wired back to the proper terminals in the
control panel (see wiring diagram that came with the panel and/or was

er is connected to is on

and running. Make sure it is running at the expected speed and
volume as scheduled in the Submittals and on the Humidifier
Schedule. If the volume (CFM) is more than 20% different than what

izing of the humidifier please

Содержание RAH-SAU series

Страница 1: ...INSTALLATION AND OPERATION FOR VS 7 14 INSTALLATION AND OPERATION FOR RAH SAU Series 1 INSTALLATION AND OPERATION...

Страница 2: ...eference of the End User or Installer The following rules should be followed Place the Control Panel in a place where the outlet fog will not impinge on any surfaces Make sure to verify the air patter...

Страница 3: ...vide humidifiers Utilize a t connector provided and taped to the RO system metal frame to hook up the product water blue line to the storage tank Locate the 2 5 gallon storage bladder proximity to the...

Страница 4: ...Generator panel at the appropriately labeled locations on the terminals Refer to the Wiring Diagram provided with your unit for proper landing locations and line sizes Shielded control wire is recomme...

Страница 5: ...ed to a drain Turning the System On go to the control panel and make sure the panel on off switch is off open up the control panel and make sure the circuit breaker CB is off if CB is showing green th...

Страница 6: ...ith the system it should become active and show figures on it s display The should correspond to both the actual humidity level and the target set point humidity level Make sure their respective readi...

Страница 7: ...turned off and verify that the Humidifier turns off as well as air flow stops b With the AC System back on if possible locate the HiLimit switch and lower its setting to as low as it can go The switc...

Страница 8: ...xcessive continuous run time when humidifier is undersized or the space really needs more humidifiers but the customer elected not to furnish and install them If your model has a timer delay relay go...

Страница 9: ...ure that the comes on Verify that the air flow switch has closed after properly sensing that air is moving in the duct Verify that the HiLimit switch circuit is closed Check the Wet Switch and verify...

Страница 10: ...on when there is a call for humidification and not just when there is a call for heat There is a dry contact relay in the panel for exactly this purpose Contact the Installer to verify that he utilize...

Страница 11: ...g sure all the UPC discs that should be running are indeed doing so You may do this by observing the operation with a flash light and peering through the plastic lid or taking the lid off see above in...

Страница 12: ...12...

Страница 13: ...13...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...16...

Страница 17: ...17...

Страница 18: ...18...

Страница 19: ...19...

Страница 20: ...120V 1PH Power On R 96 VA 7 6 UPC TANK 3 2 WET SWITCH 9 40 VA 10 WIRING FOR RAH SAU LAB UNIT WITH VECTOR CONTROLLER G Fog On Fill SV 2 11 A 17B Low Water CR3 NC WET SWITCH R WS 12B CR3 CR4 FLOAT SWITC...

Страница 21: ...Idec Single Pole Relay 6048 Idec Single Pole Socket 6050 EMI RFI Fan Guard PARTS LIST Item Description 2 4 MHz Nebulizer Board Model 579R3 304SS with welds stand brackets top flange w PEMS and bottom...

Страница 22: ...y or Factory Representative for current pricing Fan Guard for 4 69 Fan Bulkhead Conn 1 4T x 1 8MPT Brass Part B 400 11 2 clear w paper back in square ft units 10 Amp fuse 12 32 dia time delay 250 VAC...

Отзывы: