background image

 

 

 

 

 

 

Green Loo 

PO Box 2678 

Burleigh BC, QLD 4220 

[email protected] 

www.greenloo.org 

 

Содержание GT 120

Страница 1: ...Composting Toilet Owners Installation Operation Manual for the GT 120 Family and GT 330 ECO REMOTE SYSTEM...

Страница 2: ...transformer to the vacuum flush unit and from the transformer to the pedestal Run of single signal wire from the vacuum flush unit to the pedestal Space for the composting container and a firm dry an...

Страница 3: ...2...

Страница 4: ...former and signal wire from the pedestal to vacuum flush unit 8 Installing the ventilation pipe work including fan and vent cowl to composting container 9 Preparing the excess liquids dispersal trench...

Страница 5: ...although the system is designed to be able to lift up to 1 8m if a lift of i e 0 6m C1 is followed by a drop and then by another lift of 1 2m C2 although the overall height difference is less than 1...

Страница 6: ...2 No Upward Slope...

Страница 7: ...mping Up Although the system is capable of pumping up out of the expelling side of the vacuum flush unit it is preferred that this is avoided Speaking plainly there will be stagnant sewage in the expe...

Страница 8: ...2...

Страница 9: ...2 Pipe Basics...

Страница 10: ...2...

Страница 11: ...2 Connecting the hose to fittings The hose can be heated in hot water to make this easier Solvent Bonding...

Страница 12: ...2 Hose Connections...

Страница 13: ...ion 1 Install the pedestal see separate installation guide for basic installation instructions There are 3 different through floor installation options The option shown on the right is the one most co...

Страница 14: ...2 The option below is for the side discharge pedestal option...

Страница 15: ...2 2 Connect water supply to pedestal keep water turned off until priming the system...

Страница 16: ...ures a variety of connectors which are not relevant to this installation There are two plugs cut the plug with the 4 wires black red green and orange disregard the orange wire thread back through the...

Страница 17: ...2 4 Install flush control panel and connect Ethernet cable from panel to pedestal...

Страница 18: ...2 5 Connect pipe work from pedestal to vacuum flush unit 6 Connect pipe work from the vacuum flush unit to the composting container...

Страница 19: ...2...

Страница 20: ...at the back right of the picture below and signal wire from the pedestal to vacuum flush unit see picture below Connect electrical bridge wire to the 2 left contacts Safety cap of the flush unit need...

Страница 21: ...ng backwards Cut a hole in the wall if present allowing the vent pipe assembly to traverse the wall 2 Install the fan by cutting off 2 short pieces of the vent pipe and inserting the fan as a joiner P...

Страница 22: ...2...

Страница 23: ...the amount of people using the system The trench is to be 400mm wide 400mm deep However dimensions must not be less than required by Regulation 50 of the Health Treatment of Sewage and Disposal of Eff...

Страница 24: ...k and peat Before putting the system into use insert the liquids separation tray and fill the bottom with a 5 cm layer of pine bark and then a 5cm layer of peat both supplied as a starter kit Also aft...

Страница 25: ...2 12 Final checks before use priming of system...

Страница 26: ...2...

Страница 27: ...2...

Страница 28: ...valve and encouraging the blockage to be sucked through with a round ended wooden stick old cooking spoon Changing Flush Modes VacuFlush all ceramic toilets offer two flush settings to help manage wat...

Страница 29: ...pty the GT System protective clothing face mask glasses and gloves must be worn at all times Disconnect the rubber connectors that joins the ventilation pipe to the lid of the composting container Lif...

Страница 30: ...2 4 CLIMATIC CONDITIONS Composting will occur satisfactorily between 5 and 50 degrees Celsius However the unit must be protected from frost...

Страница 31: ...and trouble free use Please don t hesitate to contact us with any questions suggestions we are here to help Feedback is always welcome and is an invaluable part of providing an excellent product and s...

Страница 32: ...2 Green Loo PO Box 2678 Burleigh BC QLD 4220 info greenloo org www greenloo org...

Отзывы: