2
Installation of the GTs involves:
1.
Installing the pedestal (see separate installation guide)
2.
Connecting water supply to pedestal
3.
Connecting power supply (from the transformer) and signal wire to pedestal
4.
Installing flush control panel and connecting Ethernet cable from panel to pedestal
5.
Connecting pipe work from pedestal to vacuum flush unit
6.
Connecting pipe work from the vacuum flush unit to the composting container
7.
Connecting
power supply (from the transformer) and signal wire (from the pedestal) to vacuum flush unit
8.
Installing the ventilation pipe-work, including fan and vent cowl to composting container
9.
Preparing the excess liquids dispersal trench and connecting excess liquids drain
10.
Preparing the composting container with pine bark and peat
11.
Final checks before use & priming of system.
Space Required
There is no ideal set of measurements which will suit all applications but you do need to provide enough space to locate and install the
composting container, enough space to fit and maintain the air vent piping and fan and enough space to access and exchange the containers,
so allow space to maneuver the bins.
Содержание GT 120
Страница 3: ...2...
Страница 6: ...2 No Upward Slope...
Страница 8: ...2...
Страница 9: ...2 Pipe Basics...
Страница 10: ...2...
Страница 11: ...2 Connecting the hose to fittings The hose can be heated in hot water to make this easier Solvent Bonding...
Страница 12: ...2 Hose Connections...
Страница 14: ...2 The option below is for the side discharge pedestal option...
Страница 15: ...2 2 Connect water supply to pedestal keep water turned off until priming the system...
Страница 17: ...2 4 Install flush control panel and connect Ethernet cable from panel to pedestal...
Страница 19: ...2...
Страница 22: ...2...
Страница 25: ...2 12 Final checks before use priming of system...
Страница 26: ...2...
Страница 27: ...2...
Страница 32: ...2 Green Loo PO Box 2678 Burleigh BC QLD 4220 info greenloo org www greenloo org...