Prepare the excess liquids dispersal trench and connecting excess liquids drain (materials supplied except for gravel/soil.
An absorption trench is required to deal with any excess liquid.
The length of the trench is 2 – 4 m depending on the amount of people using the system. The trench is to be 400mm wide, 400mm deep.
However, dimensions must not be less than required by Regulation 50 of the Health (Treatment of Sewage and Disposal of Effluent and Liquid
Waste) Regulations 1974 or AS/NZS 1547. See diagram for a GT 120 installation below.
The excess liquids drain from the composting, fallow container can be connected into this drain or needs to be disposed of in the same way.
Содержание GT 120
Страница 3: ...2...
Страница 6: ...2 No Upward Slope...
Страница 8: ...2...
Страница 9: ...2 Pipe Basics...
Страница 10: ...2...
Страница 11: ...2 Connecting the hose to fittings The hose can be heated in hot water to make this easier Solvent Bonding...
Страница 12: ...2 Hose Connections...
Страница 14: ...2 The option below is for the side discharge pedestal option...
Страница 15: ...2 2 Connect water supply to pedestal keep water turned off until priming the system...
Страница 17: ...2 4 Install flush control panel and connect Ethernet cable from panel to pedestal...
Страница 19: ...2...
Страница 22: ...2...
Страница 25: ...2 12 Final checks before use priming of system...
Страница 26: ...2...
Страница 27: ...2...
Страница 32: ...2 Green Loo PO Box 2678 Burleigh BC QLD 4220 info greenloo org www greenloo org...