5.Trial operation
5-1 Inspection before the trial operation
Please check if the following items before the trial operation.
1)If the unit is installed correctly;
2)If the piping and wiring are correct;
3)If the drainage is smooth;
4)If the thermal insulation is well done;
5)If the grounding wire is connected properly;
6)If the power supply voltage fits the rated voltage of the unit;
7)If there is any barrier in front of the air inlet/outlet;
8)If the air inside the water circuit system is totally evacuated, if all the valves are opened;
9)The current leak protector can act effectively;
10)The inlet water pressure is no less than 0.15MPa.
5-2 Trial operation
When all the above items are normal, connect the power supply and start the unit.
During the trial operation, check the following items:
1) If the unit working performance is normal, if it can normally produce the demanded
heating capacity or cooling capacity.
2) If the water connection is tightly fixed without water leak
3) If the fan blade runs normally;if the outlet air is smooth and if there is abnormal vibration
from the fan motor;
4) During the unit running, if there is abnormal vibration and noise.
5) If the operation keys of the controller is flexible, reliable and responds normally.
6) If the controller display is normal, if there is missing or wrong segment, if the back light
brightness is normal.
7) If there is any abnormal vibration and pipeline collision from the pipe system during the
operation.
8) If the power line is hot abnormally during the unit operation; If all the above is normal,
the unit can be sent to the customer to put in use.
Содержание ANTEK AIR MAGNA 100
Страница 8: ...AIR MAGNA 100 GREEN ENERGY SYSTEMS 8 3 Installation 3 4 The space of installation and maintenance...
Страница 15: ...AIR MAGNA 100 GREEN ENERGY SYSTEMS 15 4 User instruction...
Страница 16: ...AIR MAGNA 100 GREEN ENERGY SYSTEMS 16 4 User instruction...
Страница 17: ...AIR MAGNA 100 GREEN ENERGY SYSTEMS 17 4 User instruction...
Страница 28: ...AIR MAGNA 100 GREEN ENERGY SYSTEMS 28 8 Wiring diagram...
Страница 33: ...AIR MAGNA 100 GREEN ENERGY SYSTEMS 33 Note...