AIR-TO-WATER HEAT PUMP INSTALLATION
83
Note:
①
No additional charge of the refrigerant is need when the pipe length is less than 10 m
(the standard pipe length is 7.5m) , f the pipe length is longer than 10 m ,additional
charge of the refrigerant is needed according to the table.
Example: if 16kw model is installed at a distance of 25m, (25-10)*50=750g refrigerant
should be added;
②
Rated capacity is based on standard pipe length and maximum allowable length is
base on the product reliability in the operation.
③
Oil trap should be installed every 5-7 meters when the location of outdoor unit is
higher than indoor unit.
2 ELECTRIC WIRING WORK
2.1 Wiring Principle
(1).General principles
Wires, equipment and connectors supplied for use on the site must be in
compliance with provisions of regulations and engineering requirements.
Only electricians holding qualification are allowed to perform wire connection on
the site.
Before connection work is started, the power supply must be shut off.
Installer shall be responsible for any damage due to incorrect connection of the
external circuit of the unit.
Caution --- MUST use copper wires.
(2). Connection of power cable to the electric cabinet of the unit
Power cables should be laid out through cabling trough, conduit tube or cable
channel.
Power cables to be connected into the electric cabinet must be protected with
rubber or plastic to prevent scratch by edge of metal plate.
Power cables close to the electric cabinet of the unit must be fixed reliably to
make the power terminal in the cabinet free from an external force.
Power cable must be grounded reliably.
Содержание SXVD200LCJ/A-K
Страница 1: ...Air to Water Heat Pump Service Manual T1 R410A 50Hz GREE ELECTRIC APPLIANCES INC OF ZHUHAI...
Страница 3: ...GREE COMMERCIAL AIR CONDITIONERS AIR TO WATER HEAT PUMP PRODUCT...
Страница 15: ...GREE COMMERCIAL AIR CONDITIONERS AIR TO WATER HEAT PUMP CONTROL...
Страница 69: ...GREE COMMERCIAL AIR CONDITIONERS AIR TO WATER HEAT PUMP INSTALLATION...
Страница 81: ...AIR TO WATER HEAT PUMP INSTALLATION 76...
Страница 107: ...GREE COMMERCIAL AIR CONDITIONERS AIR TO WATER HEAT PUMP MAINTENANCE...
Страница 115: ...AIR TO WATERHEATPUMP MAINTENANCE 109 2 Comp Low pressure Protection E3 3 Comp Discharge Temp Protection E4...
Страница 116: ...AIR TO WATERHEATPUMP MAINTENANCE 110 4 Overload proection of compressor or driver error E5 5 Outdoor fan error EF...
Страница 117: ...AIR TO WATERHEATPUMP MAINTENANCE 111 6 Temperature sensor error 7 Communication Malfunction E6...
Страница 121: ...AIR TO WATERHEATPUMP MAINTENANCE 115 3 1 3 Trip Fig 3 1 3 Flowchart of trip diagnosis...
Страница 129: ...AIR TO WATERHEATPUMP MAINTENANCE 123 3 2 3 Tripping Fig 3 2 3 Flowchart of diagnosis of Tripping...
Страница 148: ...AIR TO WATERHEATPUMP MAINTENANCE 142 Indoor Unit 1 Front panel assy Fig 2 Fig 1 Fig 2...
Страница 153: ...AIR TO WATERHEATPUMP MAINTENANCE 147 Exploded View of GRS CQ8 0Pd Na k O and GRS CQ10Pd Na K O...
Страница 155: ...AIR TO WATERHEATPUMP MAINTENANCE 149 Exploded View of GRS CQ12Pd Na K O GRS CQ14Pd Na K O and GRS CQ16Pd Na K O...