(10) The waterway pipeline can be installed only after fixing the hydro box. Do not let duct and
other foreign objects getting into the pipeline system during installing the connection pipe.
(11) After connection of all water pipes, firstly check them for leakage. If ensuring no leakage,
carry out thermal insulation to all pipe systems. Take care on thermal insulation at the
connection of valves and pipe fittings. It is recommended to use thermal insulation cotton
not less than 15mm thick.
(12) The thermal insulation pressure water tank is supplied of hot water based on tap water
pressure. The user can have hot water only when there is tap water. During use, the
cutoff valve at the cold water inlet of water tank shall be kept normally open.
(13) The horizontal distance between hydro box and thermal insulation water tank shall not
exceed 5m, and the vertical fall shall not exceed 3m. If exceeds the above limitation,
please contact with us.
(14) Prepare materials according to connector size and specification above. If the cutoff valve
is installed outdoors, it is recommended to use PPR fittings, thus to avoid freezing under
low temperature.
(15) When the system is connected with ground for floor heating, please add the pressure
difference by-pass valve between water separator and water collector.
(16) For the installation instructions of floor heating engineering pump and solar power pump,
please refer to the wiring diagram. If the supply cord is damaged, it must be replaced by
the manufacturer, its service agent or similarly qualified persons in order to avoid a
hazard.
(17) The appliance shall be installed in accordance with national wiring regulations.