2018-08-02
155-015M-A
2SF24 and 2SF30
Appendix B - Assembly and Setup
70
11. Position the two drill boxes in line, end to end, with
the end chain drive sprockets outboard and
approximately 3 inches between the drill boxes.
Drills on 8 inch row spacing and narrower will have
8 inch spacing at disks between boxes.
12. Using the tractor, back the drill main frame up to the
center of the two drill boxes (8).
a.
When close, position the posts (9) on each side
of the mainframe so the face of the post
mounting angles are toward the drill frames.
b.
Attach the post (9) to the drill frames using eight
5/8 x 3
1
/
2
X 5 inch long U-bolts (10), lock
washers (11), and nuts (12).
c.
With the U-bolts left loose, slide the drill frames
inward so that the lugs (13) welded to the drill
frames are up tight against the post angles.
d.
Tighten all the nuts on the U-bolts.
13. Attach frame adjustment link
from the drill frame
to the pivot post using the clevis pin
with hairpin
cotters.
Pin to pin should be approximately 37 inches.
14. Locate drill transport stabilizer frame (16)
86
1
/
2
inches from the outside edge of each box
frame.
a.
Using
5
/
8
inch U-bolts (17), lock washers (18)
and nuts (19), mount stabilizer to box frame.
b.
Repeat for other side.
15. Adjust clevis end of pull bars (20) so that the
distance from the center line to center line of pull bar
pin holes is approximately 134
1
/
4
inches.
16. Mount pull bars to drill transport stabilizer frames
and tongue slide
. With the tongue slide in the
back position against its stop, adjust pull bar lengths
so boxes are in line with one another and parallel to
the back edge of the mainframe.
17. Extend the main lift cylinder (22) and place the
transport lock pins (23) in the transport position
through the holes in the mainframe axle side tube.
18. Fold the drill making sure that the tongue slide (21)
moves smoothly up the tongue.
a.
When drill boxes are almost folding in, stop and
adjust the post-frame adjustment links on each
box so that the tang (24) on each drill transport
stabilizer frame lines up with the nest (25) on the
front of the main frame.
b.
Fold drill completely closed.
19. With tongue slide forward on the tongue and drill
folded completely, position the pull bar lock pin (26)
across the top of the tongue slide. Adjust the
transport lock bolt (27) on top and front of tongue up
against lock pin with
1
/
16
inch clearance and lock the
jam nut. This pin prevents the drill from unfolding
when in transport.
Do not lower drill while in folded position, certain equipment
damage will occur.
20. Check to see that all nuts are tightened. See
” on page 68, for torque
specifications.
14
15
16