
7. Media Loading Procedure
63
JS310-UM-251-9370
7.3 Winding the Media onto the Take-up Unit
(1) Mount the take-up core flanges and the take-up core.
(a) Raise the take-up roller at the left-hand side and remove it.
Take-up roller
(b) Slide one of the flanges onto the roller and then fasten it in place at the right.
Flange
Use these two screws to
fasten the flange.
(c) Insert the take-up core onto the right flange.
Take-up core
(d) Insert the other flange into the left edge of the take-up core.
Flange
Use these two screws to
fasten the flange.
Take-up core
(e) Return the take-up roller to its original position.
Содержание SignJet JS310-25ES
Страница 1: ...JK310 Series MANUAL NO JS310 UM 251 SignJet Service Manual JS310 UM 251 03 9370...
Страница 7: ......
Страница 11: ......
Страница 43: ......
Страница 97: ......
Страница 111: ......
Страница 114: ...14 Ink supply system diagram 107 JS310 UM 251 9370 14 Ink supply system diagram...
Страница 115: ......
Страница 117: ......
Страница 125: ...18 Maintenance parts lists 118 JS310 UM 251 9370 16 17 26 18 19 20 21...
Страница 128: ...18 Maintenance parts lists 121 JS310 UM 251 9370 15 16 17 18 20 19 21 22 23...
Страница 130: ...18 Maintenance parts lists 123 JS310 UM 251 9370 8...
Страница 132: ...18 Maintenance parts lists 125 JS310 UM 251 9370 1 2 3 4 34 5...
Страница 133: ...18 Maintenance parts lists 126 JS310 UM 251 9370 6 9 7 8 15 10 11 12 13 14 15 16 17 18...
Страница 134: ...18 Maintenance parts lists 127 JS310 UM 251 9370 19 20 22 29 23 24 25 26 27 21 28 29 30 14...
Страница 135: ...18 Maintenance parts lists 128 JS310 UM 251 9370 31 32 33...
Страница 138: ...18 Maintenance parts lists 131 JS310 UM 251 9370 9 8 10 11 12 13 14 15 16 25 17 18 23 24 19 20 21 22 26...
Страница 139: ......
Страница 141: ......