10
The temperature at the base of the chimney can be increased by insulating the
flue-pipe between the furnace and the chimney base. If this is not sufficient,
consider cutting or removing some flue baffles in the furnace. BE AWARE
THAT REMOVING BAFFLES REDUCES THE UNIT’S EFFICIENCY AND A
MODIFIED UNIT IS NO LONGER ENERGY STAR
®
CERTIFIED.
ELECTRICAL
Wire according to the National Electrical Code (Canadian Electrical Code in
Canada) or local codes. Use a separately fused #12 electrical line directly
from the service panel to the furnace junction box. Install a manual shut-off
switch at the door or stairway to furnace room so furnace can be shut off
remotely.
COMBUSTION &
Install openings and ductwork to the furnace room providing fresh out-
VENTILATION AIR
side combustion and circulation air for cooling the furnace casing, as
installation code requires (USA NFPA 31, Canada CAN/CSA B139). If
installed in a closed room, provide two free air ventilation openings of at least
8” x 12” (96 sq. in.) free flow area near ceiling and floor. Oil burners
must have sufficient air to allow vent systems to operate properly.
Содержание KLF-100
Страница 7: ...7 KLR 200 DIMENSIONS Dimensions are in inches KLF 100 DIMENSIONS Dimensions are in inches...
Страница 22: ...22 Position of the ST9103A1028 Electronic Board KLR 100 and 200 KLF 100 KLF 200...
Страница 28: ...28 8 0 ELECTRICAL WIRING DIAGRAMS HEATING COOLING KLR KLF RIELLO...
Страница 29: ...29 HEATING COOLING For more informations see next page...
Страница 30: ...30 GeniSys control schematic with the ST9103 Board...
Страница 31: ...31 HEATING ONLY RIELLO BECKETT...
Страница 34: ...34 KLR 200 EXPLODED PARTS VIEW Detail A ELB A0 0008 00 Electric box...