5. Putting into operation:
Before putting into operation, please be absolutely sure that all the live wires and
electrical terminals are correctly insulated and that the protective covers are in
position throughout the system. Now open the transparent cover of the system
control. Now plug in the system to the appropriately fused socket for the system.
The system will now independently run through a systems check. For the duration
of the systems check (approximately 10 seconds) the display will read as follows.
Instead of “xx” the software position will be shown.
Figure 6: Display for the duration of the systems check
In the first line the system type will be shown and in the second line the software
position will be shown. After the correct initialisation of the system installation has
been acknowledged the LCD display will show the fill level as a percent (%).
The first running of the unit will show the fill level reference point that
is according to the standard factory setting tank height Standard
factory setting values:
- Tank height to overflow
: 200cm (+/- 1cm)
- Drinking water switching point
: ON at 10%
OFF at 12%
- Flushing the drinking water system
: after 14 days for 30 seconds
- Cleaning the rainwater filter
: after 14 days for 5 seconds
with rainwater
- Language
: English
Figure 7 shows the LCD display in operation mode. Except for the fill level and the
switch positions “FV” and “P” the display should correspond with the intended
default.
Page 14