Index
1
82104002
A
Approved Attachments ..................... 4-1
Attachment Operation ...................... 4-1
Attachments ..................................... 4-1
B
Boom Stow Procedure ................... 3-23
Brake System, Remote Mode .......... 3-4
C
Capacities......................................... 7-1
Chemical Hazards .......................... 1-10
Crush Hazards ................................. 1-6
D
Decals .............................................. 2-6
Dig Cycle ........................................ 3-10
Ditching Buckets............................... 4-2
E
Electrical Hazards ............................ 1-2
Emergency Procedures.................... 6-1
Engine Shutdown, Remote Mode... 3-21
Excavating Buckets .......................... 4-2
F
Front Axle Torque Check ................. 7-4
Fuse Panel ....................................... 7-6
H
Hydraulic System ............................. 7-1
I
Ignition, Upperstructure .................. 2-24
Intermittent Wiper/Washer, Upperstruc-
ture .......................................... 2-25
J
Joystick Controls ............................ 2-19
L
LCD Display ............................ 2-8, 2-14
Left Hand Arm Pod .........................2-16
Lift Capacity ....................................3-19
Lifting a Load ..................................3-16
Load Falling Hazard..........................1-9
Lubrication & Maintenance ...............5-1
Lubrication Schedule, Undercarriage 5-7
Lubrication Schedule, Upperstructure....
O
Operation, Remote Control ...............3-1
Operator Seat .................................2-23
P
Park Brake Switch, Upperstructure.2-26
Parking Procedure ..........................3-24
Personal Protection Equipment ......1-13
Placing a Load ................................3-16
Pre-Operation and Controls ..............2-1
Pre-Operation Checks ......................2-1
R
Rear Axle Torque Check...................7-5
Right Hand Arm Pod .......................2-17
S
Safety Practices ................................1-1
Safety Signal Words .........................1-1
Service & Maintenance Schedule .....5-3
10 Hour........................................5-3
100 Hour......................................5-4
1500 Hour....................................5-5
1st 30 Days - Upperstructure.......5-4
250 Hour - Upperstructure...........5-4
50 Hour........................................5-3
750 Hour......................................5-5
Slip and Fall Hazard..........................1-5
Specifications....................................7-1
Swing Hazards..................................1-3
T
Tip Over Hazard................................1-9
Index
Содержание D152
Страница 6: ...Read This First d 82104002 NOTES...
Страница 10: ...Table of Contents iv 82104002...
Страница 24: ...Section 1 General Safety Practices 1 14 82104002 NOTES...
Страница 39: ...Section 2 Pre Operation and Controls 2 15 82104002 This Page Intentionally Left Blank...
Страница 42: ...Section 2 Pre Operation and Controls 2 18 82104002 NOTES...
Страница 55: ...Section 3 Operation 3 5 82104002 This Page Intentionally Left Blank...
Страница 76: ...Section 3 Operation 3 26 82104002 This Page Intentionally Left Blank...
Страница 96: ...Index 2 82104002 Travel Hazard 1 8 U Upperstructure Cab Controls Indica tors 2 8...