
Section 5 - Lubrication & Maintenance
5-4
82104002
100 Hour Maintenance Schedule
1st 30 Days (250 hrs Max) & 250 Hour Maintenance Schedule -
(Upperstructure)
OAC
23
70
100
EVERY
C
heck Boom
Roller
A
lignment
OAC
238
0
250
Drain and Refill
Swing Transmission
O
il
Apply Open
Gear Lube to
Tilt Gear Teeth
Follow Lubrication
Schedule
250
EVERY
Inspect,
C
lean
or Replace
Heater
A
ir Filter
Follow Lubrication
Schedule
C
heck Hydraulic
C
ab Heater
O
il
Reservoir
Torque all Items
Listed in
Torque
C
hart
LB/FT (Nm)
1
st 3
0
D
A
YS
Содержание D152
Страница 6: ...Read This First d 82104002 NOTES...
Страница 10: ...Table of Contents iv 82104002...
Страница 24: ...Section 1 General Safety Practices 1 14 82104002 NOTES...
Страница 39: ...Section 2 Pre Operation and Controls 2 15 82104002 This Page Intentionally Left Blank...
Страница 42: ...Section 2 Pre Operation and Controls 2 18 82104002 NOTES...
Страница 55: ...Section 3 Operation 3 5 82104002 This Page Intentionally Left Blank...
Страница 76: ...Section 3 Operation 3 26 82104002 This Page Intentionally Left Blank...
Страница 96: ...Index 2 82104002 Travel Hazard 1 8 U Upperstructure Cab Controls Indica tors 2 8...