Repair
3A8047B
21
Dosing Valve Assembly
1. Follow
2. Disconnect all fluid lines from dosing valves (28 or
29). See F
3. Remove two bolts (31) securing dosing valve to
bracket.
4. Unscrew dosing valve nipple fitting (36 or 37) from
dosing valve outlet.
5. Disconnect pressure sensor (831) from dosing
valve. See page 56.
6. Remove dosing valves.
7. See
Ratio Control Valve Assemblies (28, 29)
on
page 56 for disassembly illustration.
8. Follow steps in reverse order to reassemble dosing
on page 56 for assembly
illustration and specifications.
F
IG
. 2: Dosing Valve Assembly
29
28
55
55
54
85
31
37
36
Содержание XM PFP 273231
Страница 38: ...Parts 38 3A8047B Base System 262878 page 2 of 5 Set air regulator to 80 psi 550 kPa 5 5 bar WL D D F E...
Страница 46: ...Parts 46 3A8047B WL D...
Страница 64: ...Dimensions 64 3A8047B Dimensions WL E WL D FP LQ FP LQ FP LQ FP LQ FP LQ FP LQ FP LQ FP LQ FP LQ...
Страница 67: ...Notes 3A8047B 67 Notes...