Setup
32
3A2175Z
4. Assemble and Connect regulator assemblies (If
Equipped).
NOTE:
Systems equipped with a fluid regulator on the
material inlet will be provided with necessary parts to
assemble the regulator. Refer to repair-parts manual for
assembly illustrations.
a. Attach the male nipple located on the regulator
assembly to the female swivel located on the
end of the pump assembly.
b. Connect the air tube to the tee fitting on the
power valve assembly located on the right side
of the machine.
5. Connect feed pumps (HFRL).
a. Install feed pumps for component A (Red) and
B (Blue) supply drums. See
.
NOTE:
A minimum feed pressure of 50 psi (0.35 MPa,
3.5 bar) is required at both feed inlet pressure gauges
(FP). Maintain A (Red) and B (Blue) feed pressures
within 10% of each other.
b. Ensure A (Red) and B (Blue) inlet valves (FV) are
closed.
c. Adjust the fluid pressure regulator so the pres
-
sure gauge reads zero.
NOTE:
Supply hoses from feed pumps should be 3/4
in. (19 mm) ID minimum.
d. Assemble, connect and tighten component
B (Blue) inlet hose to the 3/4 npt(f) swivel on the
component B (Blue) inlet assembly. Refer to
repair-parts manual for assembly illustrations
e. Assemble, connect and tighten component
A (Red) inlet hose to the 3/4 NPT(f) swivel on
the component A (Red) inlet assembly. Refer to
repair-parts manual for assembly illustrations.
pressure
ti18216a
gauge
250 psi max inlet
pressure
3000 psi max
inlet pressure
ti9883a1
FV
ti18217a
Содержание HFRL
Страница 13: ...Warnings 3A2175Z 13...
Страница 137: ...Accessories 3A2175Z 137...