Installation
8
3A8307D
Pre-Installation Procedure
The reference letters used in the instructions on this
page refer to
, F
, page 7.
2. Close the hose reel fluid shut-off valve (B).
3. Ground the hose and reel or console. See
, page 7. Do not use PTFE tape on the
pipe joints, it may cause loss of ground across the
pipe joint.
Flush the Equipment
For a new installation, or if the fluid in the lines is
contaminated, flush the lines before installing the
dispense valve. To avoid contaminating the fluid with
oil, flush the equipment with the fluid being dispensed
before using the equipment.
NOTE: The dispense valve should not be installed on
the hose when flushing the equipment.
, page 7.
2. Close the hose reel fluid shut-off valve (B) at each
dispense position.
3. For an existing installation, remove the dispense
valve from the hose.
4. Place the hose end into a container for waste fluid.
Secure the hose in the container so that it will not
come out during flushing.
NOTE: For multiple dispense positions, first flush
the dispense position farthest from the pump, then
work inward toward the pump.
5. Slowly open the hose reel fluid shut-off valve (B) at
the dispense position. Flush out a sufficient amount
of fluid to ensure that the entire system is clean,
then close the valve.
6. Repeat step 5 at all of the dispense positions.
Installing a Meter
To install a new meter in an existing installation, begin
the instructions with Step 1 and Step 2.
To install a new meter as a new installation, begin the
instructions with Step 3.
2. Loosen and disconnect the hose from the dispense
valve being replaced.
For Steps 3 - 9, refer to F
3. Thread the extension (4) into the dispense valve
outlet until the o-ring makes contact with the meter.
4. Position the extension for proper alignment.
5. Wrench tighten the jam nut (4a) for rigid extensions
and the hose fitting hex for flexible extensions.
6. Thread the new nozzle (5) onto the extension (4),
and tighten firmly.
7. Apply thread sealant to the male threads of the
hose fitting. Thread the hose fitting into the swivel
(101) and tighten firmly.
8. Open all dispense position shut-off valves (B).
9. Start the pump to pressurize the system. See the
section, page 9, for operating
instructions.
10. To ensure dispensing accuracy, purge all of the air
from the fluid lines and dispense valves before use.
F
IG
. 2
4a
4
5
101
Содержание 25U085
Страница 12: ...Operation 12 3A8307D Operation Flowchart ...
Страница 15: ...Operation 3A8307D 15 12 Reinstall the impact guard 37 FIG 9 ...
Страница 19: ...Notes 3A8307D 19 Notes ...
Страница 22: ...Parts 22 3A8307D PM8 PM20 Pressure Drop 10 Weight Oil at 70 F 21 C ...