Operation
3A8307D
13
1. Open the dispense nozzle and point it into the fill
port or a container.
2. Activate the meter.
3. Press Reset to clear the prior total.
4. Accept the default preset or adjust the preset value.
5. Dispense by squeezing the trigger toward the valve
body (F
. 4).
6. Press the trigger latch button to lock the trigger
valve in the open position (F
. 5).
7. Slowly release the trigger while pressing the trigger
latch button (F
. 5).
8. To stop dispensing before the Preset amount is
reached, release the trigger latch by pulling the
trigger toward the valve body, and releasing the
trigger (F
. 7).
9. Close the nozzle when the dispense is completed.
F
IG
. 4
F
IG
. 5
F
IG
. 6
F
IG
. 7
Содержание 25U085
Страница 12: ...Operation 12 3A8307D Operation Flowchart ...
Страница 15: ...Operation 3A8307D 15 12 Reinstall the impact guard 37 FIG 9 ...
Страница 19: ...Notes 3A8307D 19 Notes ...
Страница 22: ...Parts 22 3A8307D PM8 PM20 Pressure Drop 10 Weight Oil at 70 F 21 C ...