Typical Installation
6
3A8307D
Typical Installation
KEY:
A PM8 or PM20 Metered Dispense Valve
B Fluid Shutoff Valve - Hose Reel
C Hose
D Hose Reel Fluid Inlet Hose
E Hose Reel
F Thermal Relief Kit (required). Part No. 237904. (Install
downstream from pump.)
F
IG
. 1
F
B
D
E
C
A
NOTICE
Flush lines before installing equipment in the system
to remove contamination that can cause equipment
,
page 8.
Содержание 25U085
Страница 12: ...Operation 12 3A8307D Operation Flowchart ...
Страница 15: ...Operation 3A8307D 15 12 Reinstall the impact guard 37 FIG 9 ...
Страница 19: ...Notes 3A8307D 19 Notes ...
Страница 22: ...Parts 22 3A8307D PM8 PM20 Pressure Drop 10 Weight Oil at 70 F 21 C ...