background image

Operating instructions

PM-30E

POWER METER

ENGINEERING

TA ENGINEERING e.K. - GERMANY

Содержание PM-30E

Страница 1: ...Operating instructions PM 30E POWER METER ENGINEERING TA ENGINEERING e K GERMANY...

Страница 2: ...4 3 3 4 4 4 4 4 5 4 4 6 6 5 6 Table Measurement Parameters Setup Menue Table Setup Setting Parameter Main Voltage Show Measurement Parameters Current Frequency Power Factor Active Power Reactive Powe...

Страница 3: ...Menue Button NEXT Button Up Button down Button voltage Button current Button Frequency Button Power Faktor Button Max and Min parameter Button Active Power Button Reactive Power Button Apparent Power...

Страница 4: ...wer generation sub stations and energy management The PM 30E is housed in a switchboard case according to DIN 43700 with a compact size 144 x144x75 mm Its shallow depth of 75mm inclusive of terminals...

Страница 5: ...e at the user s disposal The bus network Max 1000 m of length get this directly about an interface converter Obliged to PC external serial RS232 interface The bus network Max 1000 m of length become d...

Страница 6: ...CT wires to X2 terminal When terminating auxiliary voltage wires and earth to X3 terminal When switching the auxiliary voltage L N ON During setup of the parameters q q q q q q These are 4 terminals f...

Страница 7: ...e Energy import Active Energy export Reactive Energy import Reactive Energy export Apparent Energy import Apparent Energy export Rotation L1 L2 L3 Current Phase L1 Voltage Phase L3 L1 Voltage Phase L2...

Страница 8: ...ime Reset Min Max Parameter SETUP MAIN Info Symbol Revision ENTER RESET ENTER RESET ENTER RESET ENTER RESET ENTER RESET ENTER RESET ENTER RESET ENTER RESET Language German English VT Parameter primary...

Страница 9: ...Reserved ENTER RESET Service Reserved Time Date change time ENTER RESET ENTER RESET change date ENTER RESET ENTER RESET ENTER RESET Info PC BUS ENTER RESET PC BUS PM 30E Address Modem Master ENTER RE...

Страница 10: ...Voltage L N U1N U2N U3N Voltage L L U12 U23 U31 Rotation L1 L2 L3 U U U Current I1 I2 I3 Frequency F I PF F P Q S Power Factor PF Active Power P1 P2 P3 Power 3 phase P Q S Reactive Power Q1 Q2 Q3 App...

Страница 11: ...K GERMANY Demand Parameters D flashing Demand Parameter in the meantime D Demand Parameter in the last Cycle xxxxxxx U I P PF xxxxxxx U I P PF D D D D D flashing xxxxxxx U I P PF Demand Parameter in t...

Страница 12: ...n U2N Min U3N Min Current Peak I1 Min I2 Min I3 Min Current Peak I1 Max I2 Max I3 Max Voltage U1N Max U2N Max U3N Max Voltage U1N Min U2N Min U3N Min Current I1 Min I2 Min I3 Min D D D Current I1 Max...

Страница 13: ...ve Power Q1 Min Q2 Min Q3 Min Apparent Power S1 Max S2 Max S3 Max Apparent Power S1 Min S2 Min S3 Min Active Power P Max P Min D Reactive Power Q Max Q Min D POWER METER PM 30E TA ENGINEERING e K GERM...

Страница 14: ...MAX SETUP ENTER MAIN RESET D min 3 1 2 4 G 3 1 2 4 G 1 2 3 4 PM 30E Power Meter I U PF W F P S Q MAX SETUP ENTER MAIN RESET D min SHIELD X2 BK 2M X2 BK 2M PM 30E Device Address 1 BC 1 IN 1 RA BUS Con...

Страница 15: ...PF W F P S Q MAX SETUP ENTER MAIN RESET D min 3 1 2 4 G 3 1 2 4 G 1 2 3 4 PM 30E Power Meter I U PF W F P S Q MAX SETUP ENTER MAIN RESET D min SHIELD X2 BK 2M X2 BK 2M PM 30E Device Address 1 BC 1 IN...

Страница 16: ...it Diagram 1 4 Wire Circuit Diagram 2 3 Wire L1 L2 L3 k l k k l l L N 1A 1A 1A T0 315A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 L1 L2 L3 N k l k k l l L N 1A 1A 1A T0 315A L1 L2 L3 N...

Страница 17: ...l k k l l L N T0 315A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 1A 1A 1A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 TA ENGINEERING e K GERMANY 17 Circuit Diagram 3 4...

Страница 18: ...uit Diagram 5 4 Wire 2xCTs Circuit Diagram 6 3 Wire 2xCTs L1 L2 L3 N k l k l L N 1A 1A 1A T0 315A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 L1 L2 L3 L N 1A 1A 1A T0 315A k l k l L1 L2...

Страница 19: ...Y Circuit Diagram 7 Single phase Circuit Diagram 8 Single phase VT L N k l L N 1A T0 315A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 L N k l L N 1A T0 315A L1 L2 L3 N 11 21 31 12 22 32...

Страница 20: ...tage Sensing Inputs X2 Currents Sensing Inputs Humidity 0 300V AC L N 20 0 5A AC Voltage 0 03VA Current 3VA 90 260V AC 5 VA 50 60 Hz 100 138000V 100 300V 5 10000A 5A or 1A 0 5 5 Digit 0 5 5 Digit 1 0...

Страница 21: ...RING e K Germany BC 1 IN 1 IN 2 BK 2M BK 4M BUS Connector Comunication Interface BUS PC BUS cable 2m length connect PM 30E with BUS Connector BK 6M PM30Net Kommunikation und Analyse Software PM30Net S...

Страница 22: ...inger Strasse 39 D 71111 Waldenbuch Germany Phone TA ENGINEERING e K ENGINEERING 49 7157 530 984 Telefax 49 7157 530 986 E mail info ta engineering de http www ta engineering de 05 02 All Rights Reser...

Отзывы: