Installation
3A2806A
9
Installation
Install 4 Drum Rack (Optional)
Refer to
4 Drum Rack, 01/0955/25 (Optional)
on
page 30 for visual clarity.
Position Drums
Place component A (red) and component B (blue)
drums as desired. Air hose connecting feed pumps is
15 ft (4.57 m) long.
Fluid hose connecting feed pumps to systems are
10 ft (3.05 m) long.
Install Drum Feed Kit
1.
Complete
Setup
instructions in the pump manual
before installing in drum feed kit.
2.
If applicable, locate drum rack to allow access for
top drum change.
3.
Dry fit all hose and fitting components to ensure
components are located properly and will reach the
HFRL. Refer to F
NOTE:
Drum to pump feed hose length can be reduced
if necessary. Refer to F
4.
Tighten all connections.
Connect Feed Pump
1.
Supply clean, dry, filtered air to feed pumps.
NOTE:
Air supply components are not included.
2.
Refer to Husky 1050 Air-Operated Diaphragm
Pump, Operation manual for instructions.
NOTICE
To avoid machine damage or personal injury,
anchor the rack to the floor with (4) 1/2” bolts (pro-
vided by customer) and verify all bolt assemblies
are tightened before loading the drums onto the
rack.
NOTICE
To avoid machine damage or personal injury, do not
supply pressure to drums.
NOTICE
To avoid improper operation, the diaphragm pump
must be floor mounted.