Installation
3A1937C
13
12.Route Power Cable from Distribution Box to Base Cube
Route power cable from distribution box to base cube as shown below.
Power Leads
from either “A” or
“B” breaker as
applicable
Power Junction
Connector
Ground Terminal
Ground Terminal