Operation
3A3111 A
9
Startup
For additional information refer to Operation manu-
al (333388).
•
Close solvent valve (A) on mix manifold
•
Close material supply lever (B) on mix manifold
•
Open resin dump valve (C)
•
Close catalyst
Benzoylperoxide
(BPO) dump valve
(D)
•
Prime catalyst
Benzoylperoxide
(BPO) slave pump
•
Open hydraulic valve (E) slowly to build
1200-1500psi on catalyst (BPO)
•
Close hydraulic valve (E)
•
Close resin dump valve (C)
•
Open hydraulic valve (E) to build pressure on Resin
(2000-2500psi)
•
Open material supply lever (B) on mix manifold
•
Reverse tip on the spray gun
•
Press the gun trigger button until material is clear of
solvent
•
Load complete
•
Enable Ratio Assurance Monitor Alarms
1. Close solvent valve (A) on mix manifold.
2. Close material supply lever (B) on mix manifold.
3. Open resin dump valve (C).
4. Close catalyst (BPO) dump valve (D).
Содержание 17G589
Страница 25: ...Notes 3A3111 A 25 Notes ...